- Page 1 and 2:
Ministry of Education and Sports Ed
- Page 3 and 4:
Final ESSP Sub-objective 2.2: Post-
- Page 5 and 6:
Final ESSP cohorts reaching age six
- Page 7 and 8:
Final ESSP In 2002 the Ministry’s
- Page 9 and 10:
2.0 POLICY OBJECTIVES Final ESSP Po
- Page 11 and 12:
Final ESSP primary, and tertiary, o
- Page 13 and 14:
Final ESSP The modern workforce, to
- Page 15 and 16:
3.0 STRATEGIES TO REACH THE OBJECTI
- Page 17 and 18:
(b) Reconfigure the post-primary su
- Page 19 and 20:
Final ESSP mobility of students amo
- Page 21 and 22:
Final ESSP (vii) Such pupils need i
- Page 23 and 24:
Final ESSP Like the curriculum revi
- Page 25 and 26:
3.1.3 Objective 3: An effective and
- Page 27 and 28:
Final ESSP horizon (such as agricul
- Page 29 and 30:
4.0 IMPLEMENTING THE ESSP Final ESS
- Page 31 and 32:
Final ESSP In order to accommodate
- Page 33 and 34:
5.2 Financing Final ESSP The Long-T
- Page 35 and 36:
Annexes Annex 1A: Guidelines for ad
- Page 37 and 38:
Annex 1B: Tables and figures cited
- Page 39 and 40:
Annexes Annex IA: Guidelines for ad
- Page 41 and 42:
Annex 1 B: Tables and figures cited
- Page 43 and 44:
IeI
- Page 46:
ANNEXES TABLES i ND FIGURES ON COST
- Page 49 and 50:
Secondary Recurrent Expenditures Wa
- Page 51 and 52:
TOTAL COST TO HOUSEHOLDS AND OTHER
- Page 53 and 54:
(b) Repeater rates are from EMIS an
- Page 55 and 56:
(c) The number of students matricul
- Page 57 and 58:
6.0 Technical Notes to the Model (a
- Page 59 and 60:
Dropout Rates Enrollment Details Ma
- Page 61 and 62:
With Real Growth in Salaries of 3.5
- Page 63 and 64:
ACADEMIC SECONDARY ESTIMATES OF ENR
- Page 65 and 66:
Total Construction Furnishings Tota
- Page 67 and 68:
TERTIARY EDUCATION Enrollment S6 Ma
- Page 69 and 70:
Primary Academic Secondary BTVET Te
- Page 72:
ANNEXES POLICY OBJECTIVES AND STRAT
- Page 75 and 76: Sub-objectives Strategies Intervent
- Page 77 and 78: ISub-objectives Strategies Interven
- Page 79 and 80: s and Targets Objectives and sub-ob
- Page 81 and 82: EDUCATION SECTOR LEVEL INDICATORS
- Page 83 and 84: Monitoring Area Indicator 9.Surviva
- Page 85 and 86: Assumptions Made in determining Per
- Page 88 and 89: Work Plan 2004/5—2006/7: Pre-prim
- Page 90 and 91: Work Plan 2004/5x-2006/7:Pre-primar
- Page 92 and 93: Work Plan 2004/5—2006/7:Pre-prima
- Page 94 and 95: Work Plan 2004/5-200617: Pre-primar
- Page 96 and 97: Work Plan 2004/5—2006/7: Post-pri
- Page 98 and 99: Work Plan 2004/5-2006/7: Post-prima
- Page 100 and 101: Work Plan 200415-200617: Post-prima
- Page 102 and 103: Work Plan .2004/5—2006/7: Teacher
- Page 104 and 105: Work Plan 2004/5—200617: Teacher
- Page 106 and 107: Work Plan 2004/5-2006/7: Higher edu
- Page 108 and 109: Work Plan 2004/5—200617: Special
- Page 110 and 111: Work Plan 2004/5-200617: Special Ne
- Page 112 and 113: Work Plan 2004/5-2006/7: Special Ne
- Page 114 and 115: Work Plan 2004/5-200617: NCDC Inter
- Page 116 and 117: Work Plan 2004/5-2006/7: NCDC Inter
- Page 118 and 119: Work Plan 2004/5-2006/7: NCDC Inter
- Page 120 and 121: Work Plan 200415-200617: EPD and MO
- Page 122 and 123: Work Plan 2004/5-2006/7: EPD and MO
- Page 124 and 125: Work Plan 2004/5-2006/7: Education
- Page 128 and 129: Work Plan 2004/5—2006/7: UNEB Int
- Page 130 and 131: Work Plan 2004/5-2006/7: Sports Int
- Page 132 and 133: Work Plan 2004/5-2006/7: Education
- Page 134: Work Plan 2004/5—2006/7: District