18.01.2023 Views

DOC-20230111-WA0038.

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UPPERSTRUCTURE / Swing Device

10. Refill grease 110 to 120g into housing (22) via

plug (23) hole.

11. Install plugs (23) (2 used) to housing (22).

:5 mm

: 9.8 N⋅m (1 kgf⋅m, 7 lbf⋅ft)

IMPORTANT: Install retaining rings (4) (3 used)

with the chamfered edge facing plate

(5).

12. Install needle bearings (8) (3 used), first stage

planetary gears (7) (3 used), first stage sun

gear (6) and plate (5) to first stage carrier (9),

and install retaining rings (4) (3 used).

13. Install thrust plate (11), plates (15) (3 used),

second stage planetary gears (14) (3 used),

and pins (12) (3 used) to second stage carrier

(13).

IMPORTANT: Tap spring pins (16) (3 used) with

slits facing upward (the motor side).

14. After aligning the holes on second stage carrier

(13) and pins (12) (3 used), tap in spring pins

(16) (3 used).

IMPORTANT: Check that the gap between the

ends of second stage planetary

gears (14) (3 used) and housing (22)

is approx. 3 mm (0.1 in).

If the gap is 12 mm (0.5 in), knock

pin (17) can be out of the hole of nut

(18).

15. Install the second stage carrier (13) assembly

onto shaft (27) so that knock pin (17) aligns with

the knock pin hole on nut (18).

Gap

14

13

22

17

18

Slits

W152-02-06-004

16

12

W152-02-06-003

W2-6-15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!