18.01.2023 Views

DOC-20230111-WA0038.

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UPPERSTRUCTURE / Pilot Valve

IMPORTANT: Attach identification tags on all disconnected

hoses to aid in reassembly.

7. Disconnect hoses (20 to 25), then attach a cap on

all disconnected the hose ends.

: 19 mm

8. Remove bolts (7) (4 used) to remove pilot valve

(19).

: 13 mm

24

25

20

21

22

Installation

23

1. Install pilot valve (19) to the console with bolts (7)

(4 used).

: 13 mm

: 10 N⋅m (1.0 kgf⋅m, 7.2 Ibf⋅ft)

W178-02-07-002

2. Connect hoses (20 to 25) to pilot valve (19).

: 19 mm

: 29.5 N⋅m (3 kgf⋅m, 21.5 lbf⋅ft)

20 - Hose T3: To pilot shut-off valve

21 - Hose B : To pilot piping coupler bracket

port B (boom lower)

22 - Hose G : To pilot piping coupler bracket

port G (bucket roll-in)

23 - Hose P2: From pilot shut-off valve

24 - Hose A : To pilot piping coupler bracket

port A (boom raise)

25 - Hose H : To pilot piping coupler bracket

port H (bucket roll-out)

NOTE: Piping location shows that of ISO pattern.

19

7

W1CC-02-07-001

W2-7-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!