18.01.2023 Views

DOC-20230111-WA0038.

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UPPERSTRUCTURE / Pilot Valve

Installation

1. Install pilot valve (16) with socket bolts (15) (2

used), spring washers (14) (2 used) and plane

washers (13) (2 used).

:8 mm

: 50 N⋅m (5.1 kgf⋅m, 37 lbf⋅ft)

2. Connect hoses (7 to 12).

: 19 mm

: 29.5 N⋅m (3.0 kgf⋅m, 21.5 lbf⋅ft)

17

18

5

6

3. Install pedal (6), levers (17) and (18) with bolts (5)

(4 used).

: 17 mm

: 50 N⋅m (5.1 kgf⋅m, 37 lbf⋅ft)

5

6

15

14

16

15

14

13

13

7

12

11

10

9

8

W1CC-02-07-004

4. Install spring washers (3) (4 used) and plane

washers (4) (4 used) to bolts (2) (4 used).

Install under cover (1) with the bolt.

: 17 mm

: 50 N⋅m (5.1 kgf⋅m, 37 lbf⋅ft)

7 - Hose P : From the pilot shut-off valve

8 - Hose T : To the pilot shut-off valve

9 - Hose 2-10 : To the control valve 1 port 10

(right travel forward)

10 - Hose 1-TR9: To control valve port 9

(right travel reverse)

11 - Hose 4-11 : To control valve port 11

(left travel reverse)

12 - Hose 3-12: (To control valve 1 port 12

(left travel forward)

IMPORTANT: After installation, check the oil level.

Start the engine and check for oil

leaks.

4

3

2

1

W1CC-02-07-003

W2-7-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!