18.01.2023 Views

DOC-20230111-WA0038.

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UPPERSTRUCTURE / Counterweight

8. Install eye bolts (A-27, M27, Pitch 3.0) onto

counterweight (18). Attach the wire ropes to the

eye bolts. Hold the counterweight by crane.

18

W190-02-02-012

CAUTION: Counterweight (18) weight:

1270 kg (2800 lb)

9. Loosen and remove mounting bolts (19) (3 used)

and washers (20) (3 used) for counterweight (18).

By crane, lift the counterweight slightly, then slide

it backwards to remove it.

: 41 mm

19

20

W190-02-02-013

W2-2-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!