18.01.2023 Views

DOC-20230111-WA0038.

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

REMOVE AND INSTALL SWING BEARING

UNDERCARRIAGE / Swing Bearing

Before removing the swing bearing, the upperstructure

must be removed first. For removal and installation of

the upperstructure, refer to “Remove and Install Main

Frame” section. In this section, the procedure starts on

the premise that the upperstructure has already been

removed.

Removal

1. Put matching marks on swing bearing (1) and

track frame (2).

Matching Mark

1 2

W105-03-01-001

2. Remove mounting bolts (3) (24 used) of the swing

bearing inner race.

: 24 mm

3

CAUTION: Swing bearing weight:93 kg

(205 lb)

3. Attach lifting tools (ST 0050) to swing bearing (4),

hoist swing bearing (4) and remove it.

W105-03-01-002

ST 0050

4

W105-03-01-003

W3-1-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!