18.01.2023 Views

DOC-20230111-WA0038.

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

10. Insert duct (7) into duct (6) and install it with

screws (8) (2 used).

:3 N⋅m (0.3 kgf⋅m, 2.2 Ibf⋅ft)

UPPERSTRUCTURE / Cab

6

7

8

11. Install duct cover (4) to the cab with screws (3) (5

used). Install caps (5) (5 used)

:3 N⋅m (0.3 kgf⋅m, 2.2 Ibf⋅ft)

W1SE-02-01-004

3

4

5

12. Install seat (1) with bolts (2) (4 used).

: 17 mm

: 50 N⋅m (5.1 kgf⋅m, 37 Ibf⋅ft)

1

W1SE-02-01-003

2

M1CC-01-012

W2-1-8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!