Installation

UPPERSTRUCTURE / Pilot Shut-Off Valve

21

22

1. Install pilot shut-off valve (7) with socket bolts (11)

(2 used).

:8 mm

: 50 N⋅m (5.1 kgf⋅m, 37 lbf⋅ft)

20

11

12

19

18

2. Install plane washer (6) to socket bolt (5).

Install rod end (8) with spring washer (9), nut (10)

and the socket bolt.

: 10 mm

:5 mm

: 20 N⋅m (2 kgf⋅m, 14.5 lbf⋅ft)

17

11 - Socket Bolts (2 used)

12 - Hose T4 : To hydraulic oil tank

13 - Hose BT : From blade pilot valve

14 - Hose PB : From solenoid valve unit

15 - Hose T3: From right pilot valve

16 - Hose HT : To shockless valve

17 - Hose T2: From left pilot valve

18 - Hose BP : To blade pilot valve

19 - Hose P1 : To left pilot valve

20 - Hose P2: To right pilot valve

21 - Hose PT : From travel pilot valve

22 - Hose PP: To travel pilot valve

8

7

15

14

16

10

9

13

W1CC-02-08-003

3. Connect hoses (12 to 22) to pilot shut-off valve

(7).

: 19 mm

: 29.5 N⋅m (3 kgf⋅m, 22 lbf⋅ft)

: 22 mm

: 39 N⋅m (4 kgf⋅m, 29 lbf⋅ft)

5

6

W197-02-08-001

4. Install spring washers (2) (6 used) and plane

washers (1) (6 used) to bolts (3) (6 used).

Install under cover (4) with the bolt.

: 17 mm

: 50 N⋅m (5.1 kgf⋅m, 37 lbf⋅ft)

4

1

2

3

W1CC-02-07-003

W2-8-3