02.08.2013 Views

CG RID u&m 02/J-Cop - Operator's Manual

CG RID u&m 02/J-Cop - Operator's Manual

CG RID u&m 02/J-Cop - Operator's Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ENG 38 MAINTENANCE<br />

GUIDE TO SCHEDULED MAINTENANCE<br />

This table is to help you maintain your machine’s safety and performance. It<br />

shows the main maintenance and lubrication work, indicating the frequency with<br />

which it should be carried out.<br />

To the right of each one there is a box where you can write the date or after how<br />

many hours of operation the work was carried out.<br />

WORK HOURS DATE OR N° OF HOURS<br />

1. MACHINE<br />

1.1 Check of tight fixing and sharpness of blade 25<br />

1.2 Blade replacement 100<br />

1.3 Check of the transmission belt 25<br />

1.4 Transmission belt replacement 2) –<br />

1.5 Checking the blade drive belt 25<br />

1.6 Blade drive belt replacement 2) –<br />

1.7 Check and adjustment of brake 10<br />

1.8 Check and adjustment of drive 10<br />

1.9 Check blade engagement and brake 10<br />

1.10 Check of tight fixing of all the elements25<br />

1.11 General lubrication 3) 25<br />

2. ENGINE 1)<br />

2.1 Engine oil change .....<br />

2.2 Check and cleaning of air filter .....<br />

2.3 Air filter replacement .....<br />

2.4 Check of fuel filter .....<br />

2.5 Fuel filter replacement .....<br />

2.6 Check and cleaning of spark plug points .....<br />

2.7 Replacement of spark plug .....<br />

1) See the engine booklet for a full list and methods of work.<br />

2) If worn, immediately contact your Dealer for the replacement.<br />

3) General lubrication should be carried out whenever the machine is to be left<br />

unused for a long period.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!