The NMEA 0183 Protocol 5APB Autopilot Sentence "B"13 151 2 3 4 5 6 7 8 9 10 11 12| 14|| | | | | | | | | | | | | | |$--APB,A,A,x.x,a,N,A,A,x.x,a,c--c,x.x,a,x.x,a*hh1) StatusV = LORAN-C Blink or SNR warningA = general warning flag or other navigation systems when areliable fix is not available2) StatusV = Loran-C Cycle Lock warning flagA = OK or notused3) Cross Track Error Magnitude4) Direction to steer, L or R5) Cross Track Units, N = Nautical Mi<strong>les</strong>6) StatusA = Arrival Circle Entered7) StatusA = Perpendicular passed at waypoint8) Bearing origin to destination9) M = Magnetic, T = True10) Destination Waypoint ID11) Bearing, present position to Destination12) M = Magnetic, T = True13) Heading to steer to destination waypoint14) M = Magnetic, T = True15) ChecksumASDAutopilot System DataFormat unknownBEC Bearing & Distance to Waypoint – Dead Reckoning121 2 3 4 5 6 7 8 9 10 11| 13| | | | | | | | | | | | |$--BEC,hhmmss.ss,llll.ll,a,yyyyy.yy,a,x.x,T,x.x,M,x.x,N,c--c*hh1) Time (UTC)2) Waypoint Latitude3) N = North, S = South4) Waypoint Longitude5) E = East, W = West6) Bearing, True7) T = True8) Bearing, Magnetic9) M = Magnetic10) Nautical Mi<strong>les</strong>11) N = Nautical Mi<strong>les</strong>12) Waypoint ID13) Checksum
The NMEA 0183 Protocol 6BODBearing – Waypoint to Waypoint1 2 3 4 5 6 7| | | | | | |$--BOD,x.x,T,x.x,M,c--c,c--c*hh1) Bearing Degrees, TRUE2) T = True3) Bearing Degrees, Magnetic4) M = Magnetic5) TO Waypoint6) FROM Waypoint7) ChecksumBWCBearing and Distance to Waypoint – Latitude, N/S, Longitude, E/W, UTC, Status111 2 3 4 5 6 7 8 9 10 | 12 13| | | | | | | | | | | | |$--BWC,hhmmss.ss,llll.ll,a,yyyyy.yy,a,x.x,T,x.x,M,x.x,N,c--c*hh1) Time (UTC)2) Waypoint Latitude3) N = North, S = South4) Waypoint Longitude5) E = East, W = West6) Bearing, True7) T = True8) Bearing, Magnetic9) M = Magnetic10) Nautical Mi<strong>les</strong>11) N = Nautical Mi<strong>les</strong>12) Waypoint ID13) ChecksumBWRBearing and Distance to Waypoint – Rhumb Line Latitude, N/S, Longitude, E/W,UTC, Status111 2 3 4 5 6 7 8 9 10 | 12 13| | | | | | | | | | | | |$--BWR,hhmmss.ss,llll.ll,a,yyyyy.yy,a,x.x,T,x.x,M,x.x,N,c--c*hh1) Time (UTC)2) Waypoint Latitude3) N = North, S = South4) Waypoint Longitude5) E = East, W = West6) Bearing, True7) T = True8) Bearing, Magnetic9) M = Magnetic10) Nautical Mi<strong>les</strong>11) N = Nautical Mi<strong>les</strong>12) Waypoint ID13) Checksum
- Page 2 and 3:
CopeMed II - ArtFiMed Documents Tec
- Page 4 and 5:
Publications CopeMed II (GCP/INT/02
- Page 6 and 7:
PréambuleLe projet FAO-CopeMed II
- Page 8 and 9:
1. IntroductionCopeMed II vise à r
- Page 10 and 11:
) Sonars de chalutc) ITId) Arts des
- Page 12 and 13:
j) EVALUAj.1. Explication et pratiq
- Page 14 and 15:
SOMMAIRE DES SUJETS
- Page 16 and 17:
SUJET 3: SONDEURSEnseignant: Joan M
- Page 18 and 19:
Ci-joint une façon d'organiser les
- Page 20 and 21:
Diagramme 2.
- Page 22 and 23:
1. Cartesian coordinate systemCarte
- Page 24 and 25:
Cartesian coordinate system 3Cartes
- Page 26 and 27:
Cartesian coordinate system 5Cartes
- Page 28 and 29:
Cartesian coordinate system 7Regard
- Page 30 and 31:
Cartesian coordinate system 9Spring
- Page 32 and 33:
Système de coordonnées 2Systèmes
- Page 34 and 35:
Global Positioning System 2Concerna
- Page 36 and 37:
Global Positioning System 4Le segme
- Page 38 and 39:
Global Positioning System 6On peut
- Page 40 and 41:
Global Positioning System 8La méth
- Page 42 and 43:
Global Positioning System 10objecti
- Page 44 and 45:
Projection de Mercator 2FormulesLes
- Page 46 and 47:
5. Transverse Universelle de Mercat
- Page 48 and 49:
Transverse Universelle de Mercator
- Page 50 and 51:
Transverse Universelle de Mercator
- Page 52 and 53:
6. Coordonnées géographiquesCoord
- Page 54 and 55:
Coordonnées géographiques 3Articl
- Page 56 and 57:
Angle solide 2Angle solide en coord
- Page 58 and 59:
Angle solide 4avec, et la somme de
- Page 60 and 61:
Logarithme 2C'est la méthode dite
- Page 62 and 63:
Logarithme 4si x=100, log(100) = 2
- Page 64 and 65:
Sphère 2L'élément d'aire de la s
- Page 66 and 67:
Sphère 4Solides géométriquesLes
- Page 68 and 69: Stéradian 2• cd : candela qui es
- Page 70 and 71: DataAdmittanceBeam patternInstallat
- Page 72 and 73: DataInstallationInstallation
- Page 97 and 98: Simrad EA 500 / EK 500STATUS AND ER
- Page 99 and 100: Status and error messagesDocument h
- Page 101 and 102: Status and error messagesMessageExp
- Page 103 and 104: Status and error messages3.2 LIST O
- Page 105 and 106: Simrad EA 500 / EK 500Note IISP-# t
- Page 107 and 108: Simrad EK 500 / EY 500List of conte
- Page 109 and 110: Calibration2 CALIBRATION PROCEDUREC
- Page 111 and 112: CalibrationThe purpose of the swive
- Page 113 and 114: Calibration1550 m/s150014501400SOUN
- Page 115 and 116: The NMEA 0183 Protocol 22. Electric
- Page 117: The NMEA 0183 Protocol 45. Sentence
- Page 121 and 122: The NMEA 0183 Protocol 8DPTHeading
- Page 123 and 124: The NMEA 0183 Protocol 10GRSGPS Ran
- Page 125 and 126: The NMEA 0183 Protocol 12LCDLoran-C
- Page 127 and 128: The NMEA 0183 Protocol 14RMB Recomm
- Page 129 and 130: The NMEA 0183 Protocol 16TLLTarget
- Page 131 and 132: The NMEA 0183 Protocol 18VWRRelativ
- Page 133 and 134: The NMEA 0183 Protocol 20ZFOUTC & T
- Page 135 and 136: The NMEA 0183 Protocol 22$PGRMFPosi
- Page 137 and 138: The NMEA 0183 Protocol 24$PGRMZ Alt
- Page 139 and 140: The NMEA 0183 Protocol 26FURGAMGCAG
- Page 141 and 142: The NMEA 0183 Protocol 288. Referen
- Page 185 and 186:
SUJET 7: PLANIFICATION ET RAPPORTS
- Page 187 and 188:
- Plote données dans le projet Arc
- Page 189 and 190:
Pour la lecture des échogrammes on
- Page 191 and 192:
Pour la lecture d’echogrammes et,
- Page 193 and 194:
Les exemplaires ont été livrés e
- Page 195 and 196:
Relation d'exercices pratiques réa
- Page 197 and 198:
Deuxième session: Nuria Díaz Ruiz
- Page 199 and 200:
• Ouvrir les fichiers avec le blo
- Page 201 and 202:
espagnole correspond à la division
- Page 203 and 204:
Polygones de ANEPOLYGONE RADIAL PÊ
- Page 205 and 206:
PESCAMEDC’est utilisé pour les c
- Page 207 and 208:
• Enfin, nous ajoutons les inform
- Page 209 and 210:
pour la pêche. S'il n'est pas vali
- Page 211 and 212:
KS_testAvec ce programme, et après
- Page 213 and 214:
• Enregistrer et fermer le fichie
- Page 215 and 216:
Appearance of the application:Our w
- Page 217 and 218:
-72. 2 = 1320658Making double click
- Page 219 and 220:
VERY IMPORTANT:Before passing CALLE
- Page 221 and 222:
We give RECORD, the icon will be sp
- Page 223:
Annexe 2: Présentation application
- Page 228 and 229:
avec des exercices pratiques des é
- Page 230 and 231:
d) Charger les cartes (thèmes) : p
- Page 232 and 233:
f) Sélectionner Radial comme champ
- Page 234 and 235:
5º.- Sélections des données :a)
- Page 236 and 237:
) Projeter les polygones en UTMc) D
- Page 238 and 239:
Annexe 2: Présentation “Initiati
- Page 240 and 241:
4.Representer les donnéesTemperatu
- Page 242 and 243:
Annexe 3: Présentation “Initiati
- Page 244 and 245:
plots• x11();• plot(x, y, ...)
- Page 246 and 247:
SUJET 11: PRATIQUESEnseignant: Joan
- Page 248 and 249:
Annexe 1. Tableau pour l’échanti
- Page 250 and 251:
SUJET 13: LECTURE DES OTOLITHESEnse
- Page 253:
5. Liste de participantsALGERIAAzze