03.03.2013 Views

GENERAL CATALOGUE - Mapei

GENERAL CATALOGUE - Mapei

GENERAL CATALOGUE - Mapei

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

98<br />

11. PRODUCTS FOR RESIN AND CEMENTITIOUS FLOORS<br />

11.1 Resin based products____________________________________________________________________<br />

Mapecoat DW 25<br />

Two-component epoxy paint for<br />

anti-acid and non-toxic coatings on<br />

concrete surfaces, suitable for contact<br />

with drinking water.<br />

Mapecoat I 24<br />

Two-component epoxy paint for<br />

anti-acid coatings on concrete surfaces.<br />

Mapecoat I 600 W<br />

Two-component transparent epoxy<br />

primer in water dispersion.<br />

Mapecoat I 600 W<br />

Lucido<br />

Two-component, shiny, transparent<br />

epoxy primer in water dispersion.<br />

EN 1504-2<br />

IN COMPLIANCE WITH<br />

EUROPEAN STANDARD<br />

PRINCIPLES<br />

PI-MC-PR-RC-IR<br />

SURFACE PROTECTION<br />

SYSTEMS FOR CONCRETE<br />

TECHNICAL DATA:<br />

Consistency: component A thick paste,<br />

component B fluid paste.<br />

Colour: component A white, component B<br />

transparent.<br />

Density (EN ISO 2811-1) (g/cm³): component A 1.43,<br />

component B 1.003.<br />

Dilution rate: supplied ready to use.<br />

Waiting time between each coat: 6-24 hours.<br />

Complete hardening time: 3 days.<br />

Application temperature range: from +5°C to +35°C.<br />

Cleaning: ethanol.<br />

Storage: 24 months.<br />

Application: roller, brush or spray.<br />

Consumption (kg/m²): 0.4-0.6 (per coat).<br />

Packaging: 5 kg kits (A + B).<br />

TECHNICAL DATA:<br />

Mixing ratio: comp. A : comp. B = 4 : 1.<br />

Colour of mix: white, grey (Ral 7001) and neutral.<br />

Application temperature range: from +5°C to +30°C.<br />

Workability time: 30-40 minutes.<br />

Setting time of film: 4-5 hours.<br />

Waiting time between first and second coat:<br />

6-24 hours.<br />

Final hardening time: 3 days.<br />

Storage: 12 months in its original sealed packaging.<br />

Application: brush, roller or airless spray.<br />

Consumption: 400-600 g/m² per coat.<br />

Packaging: 5 kg kits (A + B).<br />

TECHNICAL DATA:<br />

Consistency of mix: fluid.<br />

Colour of mix: opaline.<br />

Mixing ratio: comp. A: comp. B = 2.3 : 3.6.<br />

Workability time: 2-3 hours.<br />

Dust dry at +23°C and 50% R.H.: 3-4 hours (first<br />

coat); 6-8 hours (second coat).<br />

Final hardening time: 7 days.<br />

Application temperature range: from +8°C to +35°C.<br />

Storage: 12 months in its original sealed packaging.<br />

Application: roller, spray or airless spray.<br />

Consumption: 300-500 g/m² according to the<br />

absorption.<br />

Packaging: 5.9 kg kits (A + B).<br />

TECHNICAL DATA:<br />

Consistency of mix: fluid.<br />

Colour of mix: opaline.<br />

Mixing ratio: comp. A: comp. B = 2.3 : 3.6.<br />

Workability time: 2-3 h.<br />

Dust dry at +23°C - 50% R.H.:<br />

– 3-4 h (first coat);<br />

– 6-8 h (second coat).<br />

Final hardening time: 7 days.<br />

Application temperature range: from +8°C to +35°C.<br />

Storage: 24 months in its original sealed packaging.<br />

Application: roller, spray or airless spray.<br />

Consumption: 300-500 g/m² according to absorption.<br />

Packaging: 5.9 kg kits (A + B).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!