27.03.2013 Views

General Information on Track Circuits - RGS Online

General Information on Track Circuits - RGS Online

General Information on Track Circuits - RGS Online

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Railway Group Approved Code of Practice<br />

GK/RC0752<br />

Issue Two<br />

Date December 1998<br />

Page E6 of 52<br />

6 Mechanised <strong>Track</strong><br />

Maintenance<br />

7 Rail Drilling<br />

<str<strong>on</strong>g>General</str<strong>on</strong>g> <str<strong>on</strong>g>Informati<strong>on</strong></str<strong>on</strong>g> <strong>on</strong> <strong>Track</strong> <strong>Circuits</strong><br />

All equipment <strong>on</strong> the track must be installed clear of the tamping z<strong>on</strong>es indicated<br />

in Figure E3, except cross track orange pipe.<br />

All sleepers may be tamped, except those <strong>on</strong> either side of Silec treadles and<br />

point rodding.<br />

Figure E3<br />

E 6 R A I L T R A C K<br />

290<br />

405<br />

Tamping Z<strong>on</strong>e<br />

For c<strong>on</strong>venti<strong>on</strong>al grades of rail steel, Signal Engineers use rail drilling machines.<br />

They are preset to drill the two holes required accurately with no adjustment<br />

necessary. Available drilling machines and attachments, together with the<br />

Catalogue Numbers, are listed below:<br />

Descripti<strong>on</strong> Catalogue No.<br />

Rail b<strong>on</strong>d drilling machine, hand operated (single spindle) : 39/41822 *<br />

Rail b<strong>on</strong>d drilling machine, 110V/500W (twin spindle) : 86/43690 #<br />

Rail b<strong>on</strong>d drilling machine, petrol engine (twin spindle) : 39/41823 *<br />

S & C drilling attachment, for use with 39/41823 : 39/200000<br />

Flexible drive, 8 feet l<strong>on</strong>g, for use with 39/41823 : 39/54510<br />

Notes:<br />

Withdrawn Document<br />

Unc<strong>on</strong>trolled When Printed<br />

* The drilling machine fits over the rail and cannot be left in positi<strong>on</strong> whilst<br />

trains pass.<br />

# The drilling machine clamps to the underside of the rail and can be left in<br />

positi<strong>on</strong> whilst trains pass.<br />

At sites of heavy wear, particularly in S & C, The Permanent Way Engineer may<br />

fit specially hardened steel rails which can <strong>on</strong>ly be drilled with special drill bits.<br />

Whilst the Permanent Way Engineer permits drilling of 7.2mm holes for taper<br />

pins by Signal Engineers, drilling of larger holes in hardened steel is a specialist<br />

job to be undertaken by Permanent Way Engineering staff.<br />

405<br />

290

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!