Railway Group Approved Code of Practice<br />

GK/RC0752<br />

Issue Two<br />

Date December 1998<br />

Page E8 of 52<br />

Withdrawn Document<br />

Unc<strong>on</strong>trolled When Printed<br />

<str<strong>on</strong>g>General</str<strong>on</strong>g> <str<strong>on</strong>g>Informati<strong>on</strong></str<strong>on</strong>g> <strong>on</strong> <strong>Track</strong> <strong>Circuits</strong><br />

8.3 Pin Brazing<br />

Pin brazing is a method of c<strong>on</strong>necting threaded pins to the rail using electric–arc<br />

brazing. This method will usually be used at new sites or where re–railing takes<br />

place and may be used <strong>on</strong> standard and hardened steel rails. Pin–brazed studs<br />

will be installed by Signal or Permanent Way Engineering staff; any pers<strong>on</strong><br />

engaged in these operati<strong>on</strong>s must hold a Certificate of Competency for the task<br />

to be undertaken.<br />

An M12 pin brazed stud may be brazed to the rail web, as shown in Figure E5.<br />

The minimum spacing between c<strong>on</strong>nectors is 85mm. The correct torque for<br />

attachment of the rail lug to the M12 studs is 60Nm.<br />

NOTE<br />

Self Locking Nut (Supplied) to be<br />

tightened to a torque of 60Nm<br />

200 240<br />

E 8 R A I L T R A C K<br />

115<br />

Pin Brazed TEE C<strong>on</strong>nector<br />

Figure E5<br />

The threaded pins are brazed to the rail, at a positi<strong>on</strong> 57±2mm above the base<br />

of the rail, with a silver based filler metal, using a hand held brazing gun operated<br />

by either of the following pieces of equipment:<br />

Descripti<strong>on</strong> Catalogue No.<br />

Portable machine, battery driven <strong>on</strong> single<br />

rail trolley, suitable for track maintenance,<br />

which will braze approx. 50 pins to the rail. : 20/3003<br />

Large machine, battery driven <strong>on</strong> double rail<br />

trolley. The batteries are recharged by an<br />

integral petrol driven generator. This unit has<br />

a capacity for 50 brazes per hour and is<br />

suitable for new works. : 20/3001<br />