27.06.2013 Views

Operation and Maintenance Manual for

Operation and Maintenance Manual for

Operation and Maintenance Manual for

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SYSTEM INSTALLATION LC <strong>Manual</strong> 11/02 Rev. 3<br />

B. Remove RO pressure vessels from the frame, taking care to identify their proper<br />

location(s).<br />

C. Remove all “U” pins <strong>and</strong> end caps from each RO pressure vessel.<br />

D. Remove each RO membrane from the RO pressure vessel in the same direction<br />

in which the feed water flows through it.<br />

E. Be<strong>for</strong>e installing the new RO membrane, lightly lubricate the brine (chevron) seal<br />

<strong>and</strong> o-rings with glycerin or water.<br />

F. Load the RO membrane in the direction in which the feed water will flow,<br />

inserting the end without a brine (chevron) seal first. Be careful not to roll, cut or<br />

otherwise damage the brine (chevron) seals when loading each membrane.<br />

G. Replace the end cap into the RO pressure vessel end opposite from loading end.<br />

Secure the end cap with the retaining “U” pin.<br />

H. Install the end cap on the feed end <strong>and</strong> secure it with the other “U” pin.<br />

I. Re-install RO pressure vessels onto the frame in their proper location(s).<br />

J. Reconnect the tubing to all end cap tube fittings by pushing into the fitting until<br />

the tubing “locks” into place.<br />

2-4 USFilter

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!