Operation and Maintenance Manual for
Operation and Maintenance Manual for
Operation and Maintenance Manual for
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SYSTEM INSTALLATION LC <strong>Manual</strong> 11/02 Rev. 3<br />
B. Remove RO pressure vessels from the frame, taking care to identify their proper<br />
location(s).<br />
C. Remove all “U” pins <strong>and</strong> end caps from each RO pressure vessel.<br />
D. Remove each RO membrane from the RO pressure vessel in the same direction<br />
in which the feed water flows through it.<br />
E. Be<strong>for</strong>e installing the new RO membrane, lightly lubricate the brine (chevron) seal<br />
<strong>and</strong> o-rings with glycerin or water.<br />
F. Load the RO membrane in the direction in which the feed water will flow,<br />
inserting the end without a brine (chevron) seal first. Be careful not to roll, cut or<br />
otherwise damage the brine (chevron) seals when loading each membrane.<br />
G. Replace the end cap into the RO pressure vessel end opposite from loading end.<br />
Secure the end cap with the retaining “U” pin.<br />
H. Install the end cap on the feed end <strong>and</strong> secure it with the other “U” pin.<br />
I. Re-install RO pressure vessels onto the frame in their proper location(s).<br />
J. Reconnect the tubing to all end cap tube fittings by pushing into the fitting until<br />
the tubing “locks” into place.<br />
2-4 USFilter