27.06.2013 Views

Operation and Maintenance Manual for

Operation and Maintenance Manual for

Operation and Maintenance Manual for

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LC <strong>Manual</strong> 11/02 Rev. 3 OPERATING INSTRUCTIONS<br />

C. Once the bisulfite solution is thoroughly mixed, allow the solution to circulate<br />

through the RO unit <strong>for</strong> 30 minutes.<br />

D. Fully close the manual feed water isolation valve <strong>and</strong> install a Lock-Out device<br />

<strong>and</strong> a Lock Out Tag on the valve.<br />

E. If applicable, you may also have to fully close any process valves located in the<br />

RO unit product line down stream of the product line to prevent unwanted RO<br />

product water from passing this point, <strong>and</strong> install a Lock-Out device <strong>and</strong> a Lock<br />

Out Tag on the valve.<br />

F. Drain the pump <strong>and</strong> manifold piping.<br />

G. Seal all openings to prevent the membrane elements from drying out.<br />

H. Tag the RO unit with the date <strong>and</strong> type of solution the membranes are stored in<br />

so that it is properly flushed prior to being put back into service.<br />

The RO unit is now ready to be stored. Be sure to follow the Initial Startup in<br />

Section 3.2 when ready to put the unit back in service.<br />

USFilter 3-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!