Operation and Maintenance Manual for
Operation and Maintenance Manual for
Operation and Maintenance Manual for
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
LC <strong>Manual</strong> 11/02 Rev. 3 OPERATING INSTRUCTIONS<br />
C. Once the bisulfite solution is thoroughly mixed, allow the solution to circulate<br />
through the RO unit <strong>for</strong> 30 minutes.<br />
D. Fully close the manual feed water isolation valve <strong>and</strong> install a Lock-Out device<br />
<strong>and</strong> a Lock Out Tag on the valve.<br />
E. If applicable, you may also have to fully close any process valves located in the<br />
RO unit product line down stream of the product line to prevent unwanted RO<br />
product water from passing this point, <strong>and</strong> install a Lock-Out device <strong>and</strong> a Lock<br />
Out Tag on the valve.<br />
F. Drain the pump <strong>and</strong> manifold piping.<br />
G. Seal all openings to prevent the membrane elements from drying out.<br />
H. Tag the RO unit with the date <strong>and</strong> type of solution the membranes are stored in<br />
so that it is properly flushed prior to being put back into service.<br />
The RO unit is now ready to be stored. Be sure to follow the Initial Startup in<br />
Section 3.2 when ready to put the unit back in service.<br />
USFilter 3-5