LC <strong>Manual</strong> 11/02 Rev. 3 OPERATING INSTRUCTIONS<br />

Storage tank (if applicable) ready <strong>for</strong> use<br />

IF ALL THE ABOVE CONDITIONS EXIST, THE SYSTEM IS READY TO<br />

START. IF ONE OF THE SETTINGS IS INCORRECT, CORRECT THE<br />

SETTING PRIOR TO PROCEEDING.<br />

B. Verify the Controller is set to the proper operating mode, either TANK FEED or<br />

DIRECT FEED as described in the MC10 RO Controller manual in the Appendix.<br />

C. Press the SYSTEM START button on the Controller. This will start the system.<br />

The inlet solenoid valve will open then the pump will start after a 15 second<br />

delay.<br />

D. Verify that the product, reject, <strong>and</strong> reject recirculation flows are correct. If not,<br />

adjust the pump discharge throttling valve <strong>and</strong> the reject <strong>and</strong> reject recirculation<br />

valves. Refer to the Product Description/Equipment Specifications in the<br />

Appendix <strong>for</strong> design flowrates <strong>and</strong> pressures. Adjustment procedure:<br />

First, adjust the unit to make the correct amount of RO product water by<br />

adjusting the system pressure. This can be accomplished by regulating the<br />

pump discharge throttling valve. Further open the valve to increase the system<br />

operating pressure <strong>and</strong> productivity, further close the valve to reduce the system<br />

operating pressure <strong>and</strong> productivity.<br />

Second, adjust the unit to make the correct amount of reject to drain flow by<br />

adjusting the reject throttling valve. Open the valve to obtain a higher flow rate or<br />

close the valve to reduce the flow rate.<br />

Third, adjust the unit to make the correct amount of reject recirculation flow by<br />

adjusting the reject recirculation throttling valve. Further open the valve to obtain<br />

a higher flow rate or close the valve to reduce the flow rate.<br />

NOTE: This is somewhat of a "balancing act", in that as you close the reject valves, the<br />

product flow increases <strong>and</strong> the reject flow decreases. As you open the pump<br />

discharge-throttling valve, the product <strong>and</strong> the reject flows increase. You may<br />

have to adjust the pump discharge-throttling valve to reestablish the operating<br />

pressure to obtain the correct product flow as established in the first step.<br />

E. Once the RO unit is operating at the parameters outlined in this manual, record<br />

the operating parameters on the “RO Data Collection Form” as described in<br />

Section 4.4, <strong>and</strong> found in the Appendix. It is imperative to record the operating<br />

parameters daily, since RO trouble shooting may require a trended analysis of<br />

the RO operating parameters.<br />

NOTE: If the RO will not start, or can not achieve the correct flows, go to the trouble<br />

shooting section <strong>for</strong> more in<strong>for</strong>mation.<br />

USFilter 3-3