Operation and Maintenance Manual for
Operation and Maintenance Manual for
Operation and Maintenance Manual for
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Process Water Systems<br />
Regulations <strong>and</strong> St<strong>and</strong>ards<br />
Quality System ISO 9001 certified by the British St<strong>and</strong>ards Institute (BSI)<br />
Frame Welding Plant st<strong>and</strong>ard<br />
Electrical National Electrical Code (NEC), NEMA<br />
Seismic Rating None<br />
Piping Unit is fully tested <strong>for</strong> normal operation <strong>and</strong> conditions<br />
Documentation Package<br />
Documents Installation procedures, start-up procedures, operation<br />
procedures, functional description, flow rate chart,<br />
specifications, Spare parts list, Technical Service <strong>and</strong><br />
Support services<br />
Drawings Process <strong>and</strong> Instrumentation (P&ID), General Arrangement<br />
Quality<br />
Documents<br />
(GA) <strong>and</strong> electrical schematics<br />
Quality Assurance data reports<br />
System Production Flow Rate Specifications, gpm<br />
Model Number LC01 LC02 LC03 LC04<br />
Feed 0.8 1.6 2.4 3.2<br />
Product (maximum) 0.4 0.8 1.2 1.6<br />
Reject 0.4 0.8 1.2 1.6<br />
Reject Recycle 3.1 2.3 1.5 0.7<br />
Skid Process Connection Specifications<br />
Model Number LC01 LC02 LC03 LC04<br />
Feed Inlet ¾” FNPT ¾” FNPT ¾” FNPT ¾” FNPT<br />
Product Outlet ½” tube ½” tube ½” tube ½” tube<br />
Reject to Drain<br />
Outlet<br />
3/8” tube 3/8” tube 3/8” tube 3/8” tube<br />
Unit Configuration Specifications<br />
Model Number LC01 LC02 LC03 LC04<br />
Vessel array staging 1 1:1 1:1:1 1:1:1:1<br />
Membranes / vessel 1 1 1 1<br />
Membrane quantity 1 2 3 4<br />
Vessel quantity 1 2 3 4<br />
Pump model 112E240F11 112E240F11 112E240F11 112E240F11<br />
SV301-LC_rev2.doc Page 6 Rev. 2, 10 Oct 2001