AGENDA ITEM EXECUTIVE SUMMARY<br />
Agenda Item # 113-209<br />
Resolution Name AUTHORIZING THE DESIGN <strong>OF</strong>ADDITIONAL LIFE AND SAFETY IMPROVEMENTS TO<br />
THE 3RD STREET ELEVATOR PROJECT<br />
Ordinance<br />
Presenter/Sponsor: Tim Harbaugh, Executive Director<br />
Budget Information: Was this item budgeted? Yes J No N/A<br />
If not budgeted, Fund 500,Capital Projects<br />
explain funding<br />
source<br />
Appropriation Amount: $32,925<br />
SUMMARY: The 3rd Street Courthouse currently has one elevator to service the entire facility. This elevator is undersized both for daily<br />
use and emergency respondent requirements. On October 9, 2012 the Board passed Resolution 12- 276 which authorized<br />
$806,000 for the construction of the new Courthouse elevator (the existing elevator would remain for maintenance use and<br />
as a backup). The elevator as designed would be constructed by removing the stairwell located on the western wall of the<br />
Courthouse.<br />
The elevator construction project as designed, with a modification to the new stairs from floors 3 to 4, meets required<br />
building codes. In working with the Geneva Fire Department staff on this project, alternate life/safety improvements were<br />
identified. Under statute, the Geneva Fire Department has the authority to request and require additional life safety<br />
improvements as deemed necessary by the Fire Department. The life safety improvements required by the Fire Department<br />
are to enclose and improve the north and south stairs with a one-hour minimum fire rated construction, and to provide a<br />
firefighting standpipe system for the Fire Department use to serve from either the north or south stairs. The cost of the<br />
additional architectural work is $32,925.00, and the preliminary additional construction costs are $200,000-$250,000.<br />
This resolution authorizes the additional life and safety architectural work to the Prairie Forge Group (formerly Williams<br />
Construction Management) of St. Charles, the architectural firm who designed the elevator project, and the rebidding of the<br />
new designed elevator project.<br />
Attachments:<br />
Detailed information available from:<br />
Resolution/Ordinance Tracking:<br />
Staff Name: Tim Harbaugh Phone: 1(6300208-5173<br />
Assigned Committee: [Administration Passed Sent to: Finance/Budget on: 05/29/2013<br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Finance/Budget Passed Sent to: xecutive on: I05'29'2013 <strong>IL</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Executive Passed I Sentto: <strong>County</strong> Board on: 06/05/2013 F<br />
Committee Remarks:<br />
<strong>County</strong> Board Date: 106/11/2013<br />