09.04.2014 Views

To Know How - GROHE

To Know How - GROHE

To Know How - GROHE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3-hole basin mixer 20 144<br />

and variants 20 143<br />

3-hole bath combination 19 316<br />

Maintenance instructions<br />

Shut off hot and cold water supply!<br />

Please perform disassembly in specified order. Assemble in reverse order.<br />

Lever (Fig. left):<br />

1. Lever out plug.<br />

2. Unscrew and remove set screw using a 3mm allen key.<br />

3. Pull off lever.<br />

Escutcheon (Fig. left below):<br />

1. Pull off escutcheon and O-ring.<br />

2. Screw out screws and detach ecsutcheon mounting<br />

base.<br />

3. Unscrew cap.<br />

Cartridge (Fig. right below):<br />

1. Loosen screws and remove cartridge.<br />

2. Replace complete cartridge.<br />

Observe the correct installation position!<br />

Installation instruction:<br />

Ensure that the cartridge seals engage in the grooves on<br />

the housing.<br />

Replace screws and tighten evenly and alternately.<br />

Headpart (Fig. below):<br />

1. Pull off handle.<br />

2. Unscrew and remove screw and pull off snap insert.<br />

3. Unscrew and remove headpart using a 17mm socket<br />

wrench.<br />

4. Replace complete headpart.<br />

Observe the correct installation position<br />

Z 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!