<strong>2013</strong> <strong>Water</strong> <strong>System</strong> <strong>Plan</strong><br />

Official Yield Estimate and<br />

Long-Range <strong>Water</strong> Demand Forecast<br />

Inputs and Assumptions for the Firm Yield Estimate<br />

Firm yield of the water supply system is estimated using a simulation model developed by<br />

<strong>Seattle</strong> Public Utilities called the Conjunctive Use Evaluation (CUE) model. Additional details of<br />

the model and inputs are documented in the final report titled Firm Yield of <strong>Seattle</strong>’s Existing<br />

<strong>Water</strong> Supply Sources, November 2011, prepared by <strong>Seattle</strong> Public Utilities.<br />

Model Inputs and Assumptions<br />

<br />

<br />

<br />

<br />

<br />

Firm yield is based on the 98% reliability standard—one shortfall occurs in the 81 years<br />

of historic record.<br />

Historic weekly inflows reconstructed for water year 1929 through 2009 are used.<br />

Total system demand is shaped on a monthly demand pattern based on the average of<br />

actual deliveries from calendar year 2005 through 2009.<br />

Sources of supply are operated conjunctively as a single system.<br />

Operational assumptions include:<br />

• Cedar River <strong>System</strong>:<br />

Meet Cedar River Habitat Conservation <strong>Plan</strong> instream flow commitments below<br />

Landsburg, assuming flashboards in place on Overflow Dike.<br />

Fixed rule curve for Cedar Reservoir of 1550’ for October-February and 1563’ for<br />

May-August.<br />

Minimum levels for Chester Morse Lake: 1532’; Masonry Pool: 1510’<br />

Meet diversion limits specified by the 2006 Agreement with the Muckleshoot Indian<br />

Tribe.<br />

• South Fork Tolt <strong>System</strong>:<br />

Meet instream flows from 1988 Tolt Settlement Agreement (with treatment project).<br />

Fixed rule curve 1754’ for October-January; 1765’ for March-August.<br />

Minimum level for South Fork Tolt Reservoir: 1710’<br />

Treatment/Transmission capacity: 120 MGD<br />

• <strong>Seattle</strong> Well Fields:<br />

10 MGD withdrawn for 14 weeks as needed from July-December.<br />

5 MGD recharged for 14 weeks from January-March.<br />

Results<br />

Based on the above, the system-wide firm yield is<br />

172 million gallons per day.<br />

FINAL Page 1 of 22 December 2011