Pressure<br />

Zone<br />

Richmond<br />

Highlands<br />

590<br />

Magnolia<br />

480<br />

Queen<br />

Anne 530<br />

Volunteer<br />

530<br />

Average<br />

Day<br />

Demand,<br />

MGD 1<br />

Source of<br />

Gravity<br />

Standby<br />

Storage<br />

3.95 Richmond<br />

Highlands<br />

Tank No. 2<br />

0.82 Magnolia<br />

Tank<br />

1.21 Queen Anne<br />

Standpipe<br />

1.50 Volunteer<br />

Standpipe<br />

Total<br />

<strong>Volume</strong>,<br />

MG<br />

(Depth,<br />

feet)<br />

2.0<br />

(35’)<br />

1.0<br />

(25’)<br />

1.9<br />

(58.5’)<br />

0.9<br />

(60’)<br />

Operating<br />

Storage,<br />

MG<br />

(Operating<br />

Band, feet)<br />

0.5<br />

(10’)<br />

0.4<br />

(10’)<br />

0.3<br />

(10’)<br />

0.1<br />

(10’)<br />

Table 1. Pumped Zones Summary<br />

Dead<br />

Storage,<br />

MG 2<br />

Available<br />

Gravity<br />

Standby<br />

Storage,<br />

MG 3<br />

Amount of<br />

Time<br />

Provided,<br />

hours 4 Actions Taken Source of Non-Electric<br />

Powered Pumped Standby<br />

Storage<br />

1.4 0.1 0.6 Diesel engine driven<br />

pump at Bitter Lake<br />

Pump Station activated<br />

within 15 minutes.<br />

0.0 0.6 17.5 Lincoln Turbine<br />

activated within 15<br />

minutes.<br />

Manually operated<br />

butterfly valve at 12 Av<br />

W & W Howe opened<br />

within 3 hours to reactivate<br />

530 Armory<br />

Way feeder.<br />

1.4 0.2 4.0 Lincoln Turbine is<br />

activated within 15<br />

minutes.<br />

0.4 0.3 4.8 Lincoln Turbine<br />

activated within 15<br />

minutes.<br />

Bitter Lake Reservoir via<br />

Bitter Lake Pump Station<br />

diesel engine pump (4000<br />

gpm), remote manual startup<br />

(15-minute minimum start-up).<br />

Bitter Lake Reservoir is<br />

supplied by gravity from Lake<br />

Forest Park Reservoir, which is<br />

gravity-fed from the Tolt<br />

<strong>Water</strong> Treatment Facility and<br />

Clearwell.<br />

Cedar <strong>Water</strong> Treatment<br />

Facility and Clearwells via<br />

Lincoln Turbine (4000 gpm),<br />

remote manually controlled<br />

(15-minute minimum start-up).<br />

Cedar <strong>Water</strong> Treatment<br />

Facility and Clearwells via<br />

Lincoln Turbine (4000 gpm),<br />

remote manually controlled<br />

(15-minute minimum start-up).<br />

Cedar <strong>Water</strong> Treatment<br />

Facility and Clearwells via<br />

Lincoln Turbine (4000 gpm),<br />

remote manually controlled<br />

(15-minute minimum start-up).<br />