14.04.2014 Views

2013 Water System Plan, Volume II - Seattle City Clerk's Office - City ...

2013 Water System Plan, Volume II - Seattle City Clerk's Office - City ...

2013 Water System Plan, Volume II - Seattle City Clerk's Office - City ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Stormwater Code(2009)<br />

SMC Chapter 22.800<br />

<strong>Water</strong> Code (2007)<br />

SCM Chapter 21.04<br />

King County Code<br />

KCC Title 28<br />

Regulates stormwater, flow control, water quality, temporarily<br />

during construction and permanently after construction.<br />

Regulates current and future water demands, ensures high quality<br />

drinking water, and establishes rates for purveyors and<br />

customers.<br />

Regulations for the disposal of industrial waste into the<br />

sewerage system and establish the fees and rules.<br />

18.6.2 Director’s Rules<br />

Table 18-7 describes relevant Director’s Rules (DR’s) for <strong>Plan</strong> Review Staff. Director’s Rules are<br />

administratively approved and signed by <strong>City</strong> Department Directors. They are legally binding<br />

rules that clarify how SMC will be implemented and enforced. Most DR’s related to plan review<br />

are joint DPD and SPU Director’s Rules, and can be located in Table 18-7 or on DPD’s web site.<br />

Table 18-7 Relevant Director’s Rules for <strong>Plan</strong> Review Staff<br />

DR Number<br />

Description<br />

2010-002* Requirements for Design and Construction of Side Sewers(Drainage and<br />

Wastewater Discharges<br />

2010-003* Side Sewer Code Enforcement<br />

2010-005** Groundwater/Dewatering<br />

2009-003 Vol. I Source Control Technical Requirements Manual<br />

2009-004 Vol. <strong>II</strong> Construction Stormwater Control Technical Requirements Manual<br />

2009-005 Vol. <strong>II</strong>I Stormwater Flow Control and <strong>Water</strong> Quality<br />

2009-006 Vol. IV Stormwater Code Enforcement Manual<br />

2009-007*** Green Stormwater Infrastructure to the Maximum Extent Feasible<br />

(GSI to the MEF)<br />

*Note: As of DSG publication date, this DR is slated for approval and implementation in early 2011.<br />

**Note: As of DSG publication date, this DR is slated for approval and implementation in 2011.<br />

***Note: As of DSG publication date, this DR is in active discussion with DOE. Best info available is the Draft dated<br />

Dec. 2009<br />

18.6.3 Memoranda of Agreement and Understanding<br />

Memoranda of Agreement and Memoranda of Understanding are binding documents between<br />

a minimum of two parties. Often two or more Departments or Branches/Divisions within a<br />

Department will have a MOA or MOU. There is an Agreements Library located on PMED’s<br />

SharePoint site.<br />

18-20<br />

SPU Design Standards and Guidelines

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!