Description Design Criterion/Design Data Comments<br />

Access Ports 24-inch Located every 1,000 feet along pipeline and at<br />

both ends of tunneled crossings<br />

5.5 DESIGN PROCESS<br />

See DSG Chapter 1, Design Process. The design process for water infrastructure does not differ<br />

from that described in Chapter 1.<br />

5.6 DISTRIBUTION AND FEEDER MAIN<br />

DESIGN<br />

This section describes distribution and feeder main design. Distribution mains are smaller<br />

diameter (