Chapter 5 <strong>Water</strong> Infrastructure<br />

5.2.3 <strong>Water</strong> <strong>System</strong><br />

The SPU <strong>Water</strong> <strong>System</strong> is comprised of transmission and distribution pipelines, and storage<br />

facilities and pressure zones. The system extends far beyond the <strong>Seattle</strong> city limits (Figure 5-1).<br />

Figure 5-1<br />

SPU <strong>Water</strong> Transmission <strong>System</strong><br />

5.2.3.1 Transmission <strong>System</strong><br />

The SPU regional and sub-regional water transmission system includes 189 miles of 16- to 96-<br />

inch steel, ductile iron or concrete pipeline. Some of the large transmission pipelines are the<br />

following:<br />

Lake Youngs supply lines 4 and 5<br />

Cedar River pipelines 1 through 4<br />

Tolt pipelines 1 and 2<br />

Eastside supply line<br />

Mercer Island pipeline<br />

West <strong>Seattle</strong> pipeline<br />

SPU Design Standards and Guidelines<br />

5-5