3. The Conditional Reviewer enters comments and corrections into the PRD and returns<br />
the marked up drawings to Primary Reviewer.<br />
4. If workload balancing or special skills are required, <strong>Plan</strong> Review Coordinator consults<br />
<strong>Plan</strong> Review Supervisor.<br />
5. If not, the Primary Reviewer screens to see if the project triggers the need for a<br />
Conditional Reviewer to review plan.<br />
6. The Primary Reviewer arranges for plan to be reviewed by the Conditional Reviewer.<br />
7. The Conditional Reviewer enters comments and corrections into PRD and returns<br />
marked up drawings to Primary Reviewer.<br />
8. The Primary Reviewer reviews plans, resolves conflicts and issues, and enters final<br />
comments into the PRD.<br />
9. The <strong>Plan</strong> Review Coordinator compiles final comments and sends them to the Point of<br />
Contact per plan review request.<br />
10. The <strong>Plan</strong> Review Coordinator tracks and reports performance measures relating to the<br />
<strong>Plan</strong> Review process.<br />
Note: For more information, the SPU <strong>Plan</strong> Review Folder includes detailed process<br />
information, checklists, process diagrams, and other useful information.<br />
(J:\PDB\WS480\Public\<strong>Plan</strong> Review).<br />
18.4.2 Coordination<br />
SPU has regularly scheduled meetings to foster communication and coordination with other<br />
groups within SPU and other <strong>City</strong> departments:<br />
Representatives from SPU PMED, Operations and USM meet weekly to discuss<br />
drainage and wastewater utility issues that have come up during plan review. These<br />
issues have implications for policy, operations, or maintenance. During the meeting,<br />
the SPU reviewer consolidates branch comments onto a single set of plans.<br />
USM, Real Property Services, and SPU PMED hold monthly Build-over Meetings<br />
where they evaluate private proposals to build over SPU infrastructure.<br />
DPD, SDOT, and SPU PMED hold weekly meetings for both pre-submittal<br />
coordination and side sewer permitting. These meetings are used to discuss<br />
drainage and wastewater issues for projects seeking DPD or SDOT permits.<br />
SDOT holds semi-weekly meetings, which includes all reviewing departments. Predesign<br />
guidance and 0%-90% design issues are discussed. SPU participates in these<br />
meetings by communicating requirements and coordinating water, drainage and<br />
wastewater concerns for projects seeking SPU approval on DPD or SDOT permits.<br />
SPU PMED attends monthly coordination meetings with SDOT to collaborate on<br />
SDOT’s CIP program.<br />
18-8<br />
SPU Design Standards and Guidelines