02.05.2014 Views

Projected Costs of Generating Electricity - OECD Nuclear Energy ...

Projected Costs of Generating Electricity - OECD Nuclear Energy ...

Projected Costs of Generating Electricity - OECD Nuclear Energy ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Tables<br />

Table 2.1 Overview <strong>of</strong> responses by country and plant type 24<br />

Table 2.2 Exchange rates (as <strong>of</strong> 1 July 2003) 27<br />

Table 2.3 List <strong>of</strong> responses 28<br />

Table 2.4 Coal plant specifications 29<br />

Table 2.5 Gas plant specifications 30<br />

Table 2.6 <strong>Nuclear</strong> power plant specifications 30<br />

Table 2.7 Wind and solar power plant specifications 31<br />

Table 2.8 Hydro power plant specifications 31<br />

Table 2.9 Combined heat and power (CHP) plant specifications 32<br />

Table 2.10 Other plant specifications 33<br />

Table 3.1 Expense schedule for coal-fired power plant construction 36<br />

Table 3.2 Specific annual O&M costs (per kWe) for coal-fired power plants in 2010 37<br />

Table 3.3 Coal price assumptions provided by respondents 37<br />

Table 3.4 Expense schedule for gas-fired power plant construction 40<br />

Table 3.5 Specific annual O&M costs (per kWe) for gas-fired power plants in 2010 40<br />

Table 3.6 Gas price assumptions provided by respondents 41<br />

Table 3.7 Expense schedule for nuclear power plant construction 43<br />

Table 3.8 Specific annual O&M costs (per kWe) <strong>of</strong> nuclear power plants in 2010 44<br />

Table 3.9 <strong>Nuclear</strong> fuel cycle costs 44<br />

Table 3.10 Overnight construction costs <strong>of</strong> coal-fired power plants 49<br />

Table 3.11 Overnight construction costs <strong>of</strong> gas-fired power plants 50<br />

Table 3.12 Overnight construction costs <strong>of</strong> nuclear power plants 50<br />

Table 3.13 <strong>Projected</strong> generation costs calculated with generic assumption<br />

at 5% discount rate 51<br />

Table 3.14 <strong>Projected</strong> generation costs calculated with generic assumption<br />

at 10% discount rate 52<br />

Table 4.1 Specific annual O&M costs (per kWe) for wind power plants in 2010 54<br />

Table 4.2 Specific annual O&M costs (per kWe) for hydro power plants in 2010 56<br />

Table 4.3 Specific annual O&M costs (per kWe) for solar power plants in 2010 58<br />

Table 4.4 Overnight construction costs <strong>of</strong> wind, solar and hydro power plants 60<br />

Table 4.5 <strong>Projected</strong> generation costs calculated with generic assumption<br />

at 5% discount rate 61<br />

Table 4.6 <strong>Projected</strong> generation costs calculated with generic assumption<br />

at 10% discount rate 62<br />

Table 5.1 Overnight construction costs <strong>of</strong> CHP plants 66<br />

Table 5.2 Levelised costs <strong>of</strong> electricity generated by CHP plants<br />

at 5% and 10% discount rates 67<br />

Table 6.1 Overnight construction costs <strong>of</strong> distributed generation plants (fuel cells) 70<br />

Table 6.2 Levelised generation costs <strong>of</strong> distributed generation plants 70<br />

Table 6.3 Overnight construction costs <strong>of</strong> waste incineration and landfill gas plants 71<br />

Table 6.4 Levelised generation costs <strong>of</strong> waste incineration and landfill gas plants 71<br />

Table 6.5 Overnight construction costs <strong>of</strong> combustible renewable plants 72<br />

Table 6.6 Levelised generation costs <strong>of</strong> combustible renewable plants 72<br />

8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!