Overnight Capital <strong>Costs</strong>: Construction<br />
Table A2.16 – Other plant investment cost coverage<br />
AUT CZE CZE DNK DNK DEU NLD USA USA USA<br />
CHP CR WI CHP CHP CHP WI CR Geo- Landfill<br />
Biomass Multifuel Straw-coal Biogas thermal gas<br />
Direct costs<br />
- Site preparation x ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
- Civil work ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
- Material, equipment & manpower for construction ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Indirect costs<br />
- Design, engineering & supervision ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
- Provisional equipment & operation x ✔ ✔ ns ✔ ✔ ✔ ✔ ✔<br />
- Worksite administrative expenses ✔ ✔ x ns ✔ ✔ ✔ ✔ ✔ ✔<br />
Owner’s costs<br />
- General administration ✔ x x ns ✔ x ✔ ✔ ✔ ✔<br />
- Pre-operation ✔ x ✔ ns ✔ x ✔ ✔ ✔ ✔<br />
- R&D (plant specific) ✔ x x ns x x ✔ x x x<br />
- Spare parts x ✔ ✔ ns ✔ x ✔ ✔ ✔ ✔<br />
- Site selection, acquisition, licensing & public rel. x ✔ ✔ ns ✔ x ✔ ✔ ✔ ✔<br />
- Taxes (local/regional, plant specific) x x x ns x x ✔ x x ns<br />
Others<br />
- Major refurbishment x ✔ 1 ✔ 1 ✔ x x ✔ x x x<br />
- Decommissioning x x x ✔ ✔ x ✔ x x x<br />
- Credits x x x x x x ✔ x x x<br />
- Contingency x x x x x ✔ ✔ ✔ ✔ ✔<br />
- Miscellaneous ns x x ns ns ns ns ns ns ns<br />
Note:<br />
1. Replacement <strong>of</strong> most stressed parts according to their lifetime.<br />
Table A2.17 – Other plant O&M cost coverage<br />
AUT CZE CZE DNK DNK DEU NLD USA USA USA<br />
CHP CR WI CHP CHP CHP WI CR Geo- Landfill<br />
Biomass Multifuel Straw-coal Biogas thermal gas<br />
Operation ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Maintenance (materials, manpower, services) ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Engineering support staff ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Administration x x x ns ✔ ✔ ✔ ✔ ✔ ✔<br />
General expenses <strong>of</strong> central services (outside the site) x x x x ✔ ✔ ns ✔ ✔ ✔<br />
Taxes & duties (plant specific) x x x x x ✔ ✔ 2 x x x<br />
Insurance (plant specific) x x x ✔ ✔ ✔ ✔ x x x<br />
Major refurbishment x x x x x ✔ 1 ns x x x<br />
Operating waste disposal (e.g. coal ash, sludge) ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Credits x x x x x x ns x x x<br />
Others ns x x x x ns ns ns ns ns<br />
Notes:<br />
1. Included in the fixed operating costs.<br />
2. VAT 19% on investment.<br />
Abbreviations: ✔ = included x = excluded ns = not specified<br />