Overnight Capital <strong>Costs</strong>: Construction<br />

Table A2.16 – Other plant investment cost coverage<br />

AUT CZE CZE DNK DNK DEU NLD USA USA USA<br />

CHP CR WI CHP CHP CHP WI CR Geo- Landfill<br />

Biomass Multifuel Straw-coal Biogas thermal gas<br />

Direct costs<br />

- Site preparation x ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

- Civil work ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

- Material, equipment & manpower for construction ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

Indirect costs<br />

- Design, engineering & supervision ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

- Provisional equipment & operation x ✔ ✔ ns ✔ ✔ ✔ ✔ ✔<br />

- Worksite administrative expenses ✔ ✔ x ns ✔ ✔ ✔ ✔ ✔ ✔<br />

Owner’s costs<br />

- General administration ✔ x x ns ✔ x ✔ ✔ ✔ ✔<br />

- Pre-operation ✔ x ✔ ns ✔ x ✔ ✔ ✔ ✔<br />

- R&D (plant specific) ✔ x x ns x x ✔ x x x<br />

- Spare parts x ✔ ✔ ns ✔ x ✔ ✔ ✔ ✔<br />

- Site selection, acquisition, licensing & public rel. x ✔ ✔ ns ✔ x ✔ ✔ ✔ ✔<br />

- Taxes (local/regional, plant specific) x x x ns x x ✔ x x ns<br />

Others<br />

- Major refurbishment x ✔ 1 ✔ 1 ✔ x x ✔ x x x<br />

- Decommissioning x x x ✔ ✔ x ✔ x x x<br />

- Credits x x x x x x ✔ x x x<br />

- Contingency x x x x x ✔ ✔ ✔ ✔ ✔<br />

- Miscellaneous ns x x ns ns ns ns ns ns ns<br />

Note:<br />

1. Replacement <strong>of</strong> most stressed parts according to their lifetime.<br />

Table A2.17 – Other plant O&M cost coverage<br />

AUT CZE CZE DNK DNK DEU NLD USA USA USA<br />

CHP CR WI CHP CHP CHP WI CR Geo- Landfill<br />

Biomass Multifuel Straw-coal Biogas thermal gas<br />

Operation ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

Maintenance (materials, manpower, services) ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

Engineering support staff ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

Administration x x x ns ✔ ✔ ✔ ✔ ✔ ✔<br />

General expenses <strong>of</strong> central services (outside the site) x x x x ✔ ✔ ns ✔ ✔ ✔<br />

Taxes & duties (plant specific) x x x x x ✔ ✔ 2 x x x<br />

Insurance (plant specific) x x x ✔ ✔ ✔ ✔ x x x<br />

Major refurbishment x x x x x ✔ 1 ns x x x<br />

Operating waste disposal (e.g. coal ash, sludge) ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

Credits x x x x x x ns x x x<br />

Others ns x x x x ns ns ns ns ns<br />

Notes:<br />

1. Included in the fixed operating costs.<br />

2. VAT 19% on investment.<br />

Abbreviations: ✔ = included x = excluded ns = not specified<br />