Projected Costs of Generating Electricity - OECD Nuclear Energy ...
Projected Costs of Generating Electricity - OECD Nuclear Energy ...
Projected Costs of Generating Electricity - OECD Nuclear Energy ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Overnight Capital <strong>Costs</strong>: Construction<br />
Table A2.12 – Hydro plant investment cost coverage<br />
AUT CZE DEU GRC H1 GRC H2 JPN SVK BGR ZAF<br />
Small Small Small Small Large Large Small Large Large<br />
Direct costs<br />
- Site preparation ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
- Civil work ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
- Material, equipment & manpower ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Indirect costs<br />
- Design, engineering & supervision ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
- Provisional equipment & operation ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
- Worksite administrative expenses ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Owner’s costs<br />
- General administration ✔ x x ✔ ✔ ✔ ✔ ✔ ✔<br />
- Pre-operation ✔ ✔ x ✔ ✔ ✔ ✔ ✔ ✔<br />
- R&D (plant specific) ✔ x x x x x ✔ ✔ x<br />
- Spare parts ✔ ✔ x ✔ ✔ ✔ ✔ ✔ ✔<br />
- Site selection, acquisition, licensing & public relations ✔ ✔ x x ✔ ✔ ✔ ✔ ✔<br />
- Grid connection ✔ ✔ ✔ ✔ x x ✔ ✔ x<br />
- Taxes (local/regional, plant specific) ✔ ✔ x x x x ✔ ✔ x<br />
Others<br />
- Major refurbishment x ✔ 1 x x x x x ns x<br />
- Decommissioning x x x x x x x ns x<br />
- Credits x x x ✔ x x x ns x<br />
- Contingency x x x ✔ 2 x x ✔ ns x<br />
- Miscellaneous ns x ns ns ns ns ns ns x<br />
Notes:<br />
1. Replacement <strong>of</strong> most stressed parts according to their lifetime.<br />
2. On base construction only.<br />
Table A2.13 – Hydro plant O&M cost coverage<br />
AUT CZE DEU GRC H1 GRC H2 JPN SVK BGR ZAF<br />
Small Small Small Small Large Large Small Large Large<br />
Operation ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Maintenance (materials, manpower, services) ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Engineering support staff ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Administration ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
General expenses <strong>of</strong> central services (outside the site) ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Taxes & duties (plant specific) ✔ ✔ ✔ ✔ x x x ✔ ✔<br />
Insurance (plant specific) ✔ x ✔ ✔ x ✔ x ✔ ✔<br />
Major refurbishment x x x x x x ✔ ns ✔<br />
Site leasing payments ✔ ✔ ✔ x ✔ x ✔ ✔ x<br />
Water rentals ✔ ✔ ✔ x x ✔ x ✔ x<br />
Credits x x x x ns x x ns x<br />
Others ns x ns ns x x x ns x<br />
Abbreviations: ✔ = included x = excluded ns = not specified<br />
90