Overnight Capital <strong>Costs</strong>: Construction<br />

Table A2.12 – Hydro plant investment cost coverage<br />

AUT CZE DEU GRC H1 GRC H2 JPN SVK BGR ZAF<br />

Small Small Small Small Large Large Small Large Large<br />

Direct costs<br />

- Site preparation ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

- Civil work ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

- Material, equipment & manpower ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

Indirect costs<br />

- Design, engineering & supervision ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

- Provisional equipment & operation ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

- Worksite administrative expenses ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

Owner’s costs<br />

- General administration ✔ x x ✔ ✔ ✔ ✔ ✔ ✔<br />

- Pre-operation ✔ ✔ x ✔ ✔ ✔ ✔ ✔ ✔<br />

- R&D (plant specific) ✔ x x x x x ✔ ✔ x<br />

- Spare parts ✔ ✔ x ✔ ✔ ✔ ✔ ✔ ✔<br />

- Site selection, acquisition, licensing & public relations ✔ ✔ x x ✔ ✔ ✔ ✔ ✔<br />

- Grid connection ✔ ✔ ✔ ✔ x x ✔ ✔ x<br />

- Taxes (local/regional, plant specific) ✔ ✔ x x x x ✔ ✔ x<br />

Others<br />

- Major refurbishment x ✔ 1 x x x x x ns x<br />

- Decommissioning x x x x x x x ns x<br />

- Credits x x x ✔ x x x ns x<br />

- Contingency x x x ✔ 2 x x ✔ ns x<br />

- Miscellaneous ns x ns ns ns ns ns ns x<br />

Notes:<br />

1. Replacement <strong>of</strong> most stressed parts according to their lifetime.<br />

2. On base construction only.<br />

Table A2.13 – Hydro plant O&M cost coverage<br />

AUT CZE DEU GRC H1 GRC H2 JPN SVK BGR ZAF<br />

Small Small Small Small Large Large Small Large Large<br />

Operation ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

Maintenance (materials, manpower, services) ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

Engineering support staff ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

Administration ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

General expenses <strong>of</strong> central services (outside the site) ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

Taxes & duties (plant specific) ✔ ✔ ✔ ✔ x x x ✔ ✔<br />

Insurance (plant specific) ✔ x ✔ ✔ x ✔ x ✔ ✔<br />

Major refurbishment x x x x x x ✔ ns ✔<br />

Site leasing payments ✔ ✔ ✔ x ✔ x ✔ ✔ x<br />

Water rentals ✔ ✔ ✔ x x ✔ x ✔ x<br />

Credits x x x x ns x x ns x<br />

Others ns x ns ns x x x ns x<br />

Abbreviations: ✔ = included x = excluded ns = not specified<br />

90