Projected Costs of Generating Electricity - OECD Nuclear Energy ...
Projected Costs of Generating Electricity - OECD Nuclear Energy ...
Projected Costs of Generating Electricity - OECD Nuclear Energy ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table A2.2 – <strong>Nuclear</strong> plant O&M cost coverage<br />
CAN CZE FIN FRA DEU JPN KOR NLD SVK CHE USA ROU<br />
Operation ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Site monitoring ✔ ✔ x ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Maintenance (materials,<br />
manpower, services) ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Engineering support staff ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Administration ✔ x ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Operating waste management<br />
& disposal ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
General expenses <strong>of</strong> central<br />
services (outside the site) ✔ x x ✔ x ✔ ✔ ✔ x ✔ ✔ ✔<br />
Taxes & duties (plant specific) ✔ x ✔ 1 x x x x ✔ ✔ 4 x x ✔<br />
Insurance (plant specific) ✔ x ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Major refurbishment x x ✔ x ✔ 2 x x x x x x ✔<br />
Support to regulatory bodies ✔ ✔ ✔ ✔ x x x x x ✔ ✔ ns<br />
Safeguards ✔ ✔ x ✔ ✔ ns ✔ x ✔ ✔ ✔ ns<br />
Credits x x x x x x x x x x x ns<br />
Others x x x x x x ✔ 3 x ✔ 3 x x ns<br />
Notes:<br />
1. Real estate tax.<br />
2. <strong>Costs</strong> for refurbishment are included in the fixed operating costs.<br />
3. Transfers to the State Fund for Decommissioning <strong>of</strong> <strong>Nuclear</strong> Power Installations, Spent <strong>Nuclear</strong> Fuel Handling and Radioactive Waste<br />
Treatment for financing <strong>of</strong> presented works after termination <strong>of</strong> the nuclear power plant operation.<br />
4. The duties in an amount <strong>of</strong> 50 million SKK per year for the villages situated in the distance (range) 5, 10, 20 km from the nuclear facility<br />
in terms <strong>of</strong> the law no. 544/1990.<br />
Table A2.3 – <strong>Nuclear</strong> fuel cycle cost coverage<br />
CAN CZE FIN FRA DEU JPN KOR NLD SVK CHE USA ROU<br />
Uranium concentrate ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Conversion to UF 6 ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ na<br />
Enrichment ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ na<br />
Fuel fabrication ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />
Spent fuel transportation ✔ ✔ x ✔ ✔ ✔ x ✔ ✔ ✔ ✔ ✔<br />
Spent fuel encapsulation & disposal ✔ ✔ ✔ na ✔ ✔ x x ✔ ✔ ✔ ✔<br />
Reprocessing & waste conditioning na x x ✔ na ✔ x ✔ x x x x<br />
Waste disposal ✔ x x ✔ ✔ ✔ x ✔ x ✔ x x<br />
Credits x x x x x x x x x ns x x<br />
First core inventory x 1 ✔ x ✔ ✔ ✔ ✔ ✔ x 1 ✔ x x<br />
Taxes on nuclear fuel ✔ x x x ns x ✔ x x x x ✔<br />
Others ns x x ns ns ns ns ns ✔ 2 ns x ns<br />
Notes:<br />
1. Included in investment.<br />
2. Encapsulation and permanent (final) storage <strong>of</strong> spent fuel in the deep geological disposal.<br />
Abbreviations:<br />
✔ = included<br />
x = excluded<br />
na = not applicable<br />
ns = not specified<br />
83