The availability/capacity factors reported are around 50% except for AUT-H2 in Austria (36.5%) and<br />

GRC-H2 in Greece (25%). The economic lifetimes <strong>of</strong> hydro power plants considered in the study vary<br />

from 30 years to 60 years.<br />

The levelised costs <strong>of</strong> hydroelectricity obtained with the cost elements provided by respondent countries<br />

are displayed in Figures 4.6 and 4.7 at 5% and 10% discount rate respectively and given in Tables 4.5<br />

and 4.6.<br />

Figure 4.6 – Levelised costs <strong>of</strong> hydroelectricity at 5% discount rate (USD/MWh)<br />

USD/MWh<br />

250<br />

O&M<br />

Investment<br />

200<br />

150<br />

100<br />

50<br />

0<br />

AUT-H1<br />

AUT-H2<br />

CZE-H<br />

DEU-H<br />

GRC-H1<br />

GRC-H2<br />

SVK-H<br />

JPN-H<br />

Figure 4.7 – Levelised costs <strong>of</strong> hydroelectricity at 10% discount rate (USD/MWh)<br />

USD/MWh<br />

250<br />

O&M<br />

Investment<br />

200<br />

150<br />

100<br />

50<br />

0<br />

AUT-H1<br />

AUT-H2<br />

CZE-H<br />

DEU-H<br />

GRC-H1<br />

GRC-H2<br />

SVK-H<br />

JPN-H<br />

57