cost <strong>of</strong> nuclear generated electricity at 10% discount rate as compared with the levelised cost at 5% discount<br />

rate, visible on Figures 3.8 and 3.9, is a characteristic <strong>of</strong> nuclear energy and other capital intensive<br />

technologies for generating electricity.<br />

At 5% discount rate, the levelised costs <strong>of</strong> nuclear generated electricity range between 21 and<br />

31 USD/MWh except for the two plants in the Netherlands and Japan. Investment costs represent the<br />

largest share <strong>of</strong> total levelised costs, around 50% in average while O&M costs represent around 30% and<br />

fuel cycle costs around 20%. The cost structure, i.e. respective shares <strong>of</strong> the three components, remains<br />

fairly stable from country to country.<br />

At 10% discount rate, the levelised costs <strong>of</strong> nuclear generated electricity are in the range 30 to<br />

50 USD/MWh in all countries except the Netherlands and Japan. In Japan, the levelised cost exceeds<br />

largely 60 USD/MWh. The share <strong>of</strong> investment in total levelised generation cost is around 70% while the<br />

other cost elements, O&M and fuel cycle, represent in average 20% and 10% respectively.<br />

Figure 3.8 – Levelised costs <strong>of</strong> nuclear generated electricity at 5% discount rate (USD/MWh)<br />

USD/MWh<br />

70<br />

60<br />

50<br />

Fuel<br />

O&M<br />

Investment<br />

40<br />

30<br />

20<br />

10<br />

0<br />

CAN-N<br />

USA-N<br />

CZE-N<br />

FIN-N<br />

FRA-N<br />

DEU-N<br />

NLD-N<br />

SVK-N<br />

CHE-N<br />

JPN-N<br />

KOR-N1<br />

KOR-N2<br />

Figure 3.9 – Levelised costs <strong>of</strong> nuclear generated electricity at 10% discount rate (USD/MWh)<br />

USD/MWh<br />

70<br />

60<br />

50<br />

ROU-N<br />

Fuel<br />

O&M<br />

Investment<br />

40<br />

30<br />

20<br />

10<br />

0<br />

CAN-N<br />

USA-N<br />

CZE-N<br />

FIN-N<br />

FRA-N<br />

DEU-N<br />

NLD-N<br />

45<br />

SVK-N<br />

CHE-N<br />

JPN-N<br />

KOR-N1<br />

KOR-N2<br />

ROU-N