Table A2.11 – Wind plant O&M cost coverage<br />

AUT BEL CZE DNK DNK DNK DEU GRC GRC GRC GRC ITA ITA NLD PRT USA<br />

W1 W2 W3 W1 W2 W3-4 W5 W1 W2<br />

Operation ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

Maintenance (materials,<br />

manpower, services) ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

Engineering support staff ✔ ✔ ✔ ✔ ✔ ns ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

Administration ✔ ✔ x ✔ ✔ ns ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

General expenses <strong>of</strong> central services<br />

(outside the site) x ✔ x ✔ ✔ ns ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔<br />

Taxes & duties (plant specific) ✔ x x ns x ns ✔ ✔ ✔ ✔ ✔ ✔ ✔ x ✔ x<br />

Insurance (plant specific) ✔ ✔ x ✔ ✔ ns ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ x<br />

Major refurbishment x ns x ✔ 1 x ns x x x x x ✔ x x ✔ 3 x<br />

Site leasing payments ns ✔ ✔ x x ns ✔ x x x x ✔ ✔ x ✔ ✔<br />

Credits ns ns x x x ns x x x x x ✔ ✔ x x x 4<br />

Others ns ns x ✔ x ns ns x x x x ns ✔ ✔ 2 x ns<br />

Notes:<br />

1. Major overhauls foreseen twice during lifetime. Decommissioning costs are included in O&M budget as well.<br />

2. Environmental monitoring programme (1.0 million €/year).<br />

3. Increase <strong>of</strong> O&M costs from eleventh year onwards.<br />

4. Specific network charges are included in the modelling and analysis, but because <strong>of</strong> the extreme variability, they are not included<br />

in the costs given in the questionnaire.<br />

Abbreviations: ✔ = included x = excluded ns = not specified<br />