12.06.2014 Views

HVO 2009 Annual Environmental Management Report - Final

HVO 2009 Annual Environmental Management Report - Final

HVO 2009 Annual Environmental Management Report - Final

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Coal & Allied – Hunter Valley Operations<br />

11,000<br />

Other Tributaries EC Trends<br />

10,000<br />

9,000<br />

8,000<br />

Electrical Conductivity (uS/cm)<br />

7,000<br />

6,000<br />

5,000<br />

4,000<br />

3,000<br />

2,000<br />

1,000<br />

0<br />

Jan 09<br />

Feb 09<br />

Mar 09<br />

Apr 09<br />

May 09<br />

Jun 09<br />

Jul 09<br />

Date<br />

Aug 09<br />

Sep 09<br />

Oct 09<br />

Nov 09<br />

Dec 09<br />

Davis Creek Comleroi Creek Emu Creek<br />

Parnells Creek Farrells Creek W 11 ANZECC EC upper limit<br />

ANZECC EC lower limit<br />

Figure 37: Other Tributaries EC Trends<br />

60<br />

Other Tributaries TSS Trends<br />

50<br />

Total Suspended Solids (mg/L)<br />

40<br />

30<br />

20<br />

10<br />

0<br />

Jan 09<br />

Feb 09<br />

Mar 09<br />

Apr 09<br />

May 09<br />

Jun 09<br />

Jul 09<br />

Date<br />

Aug 09<br />

Sep 09<br />

Oct 09<br />

Nov 09<br />

Dec 09<br />

Farrell's Creek W11 Comleroi Creek Emu Creek<br />

Parnells Creek<br />

ANZECC TSS Upper Limit<br />

Figure 38: Other Tributaries TSS Trends<br />

Surface Water Monitoring for <strong>HVO</strong> Site Dams<br />

Ten dams were monitored monthly during the reporting period. Monthly samples were collected from Dam<br />

11N, K Dam (Lake James) and W2 Parnells Dam. Bi-monthly samples were scheduled for Emu Creek<br />

Sediment Dam. The remaining sites were samples quarterly, including Coal Loader Dam, Dam 15N, 20N<br />

<strong>Final</strong> Dam, Dam 3S , WOOP Dump Dam, EOC Dam and W9.<br />

The surface water monitoring results for site dams are shown in Table 29 and Figure 39 to Figure 41. Due to<br />

an outlier, results at Dam W9 shown in Figure 41 the scale has been reduced to promote clarity, a full scale<br />

graph can be viewed within Appendix 8 as Figure 41A.<br />

AEMR <strong>2009</strong> 82

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!