Coal & Allied – Hunter Valley Operations<br />

Location Data Recovery (%) Comments<br />

C1(WJ039) 75% No access to site 19/03/<strong>2009</strong>.<br />

F1.5 100%<br />

GW9701 100%<br />

GW9702 100%<br />

GW9710 100%<br />

GWAR981 100%<br />

West Pit Groundwater<br />

NPZ1 100%<br />

NPZ2 100%<br />

NPZ3 100%<br />

NPZ4 100%<br />

NPZ5 100%<br />

Special Sampling was triggered on 2 March <strong>2009</strong> and 8 March <strong>2009</strong> following >40mm rainfall in 24 hours.<br />

Carrington Groundwater<br />

The interpretation of Carrington Groundwater has been based on nine key sites (Table 33) located to the west<br />

of the operational area of Carrington Pit. Bi-monthly monitoring of these sites was undertaken in accordance<br />

Coal & Allied Hunter Valley Operation’s water monitoring programme developed in consultation with DoP and<br />

DWE (now DECCW).<br />

Scheduled November sampling was unable to occur. A make up run was performed in January 2010. During<br />

<strong>2009</strong> no reportable values were captured at CGW45 and CGW46 due to the bores being dry.<br />

Data capture for <strong>2009</strong> is shown in Appendix 10. Monitoring results are shown in Table 34 and Figure 45 to<br />

Figure 47. The EC and pH levels have not been reported in graphs for sites CGW45 and CGW46 as samples<br />

were not collected.<br />

AEMR <strong>2009</strong> 95