Coal & Allied – Hunter Valley Operations<br />
High Volume Air Samplers<br />
Suspended particulate dust was measured in <strong>2009</strong> by a network of HVAS monitors, consisting of seven TSP<br />
samplers and six PM 10 samplers. A data share arrangement is in place with Anglo Coal for a TSP unit at<br />
Jerrys Plains School. The Long Point PM 10 monitor was commissioned in June <strong>2009</strong>, consequently the <strong>2009</strong><br />
average is based on 7 months data. The Long Point PM 10 is not a reportable site and is included here for<br />
information purposes only.<br />
TSP and PM 10 Data Recovery<br />
The following information describes the data capture for the reporting period.<br />
Wandewoi TSP missed three scheduled run dates due to unit operating time +/- 24 hours (17/07/<strong>2009</strong> and<br />
29/07/<strong>2009</strong>) and due to unit failure to run (10/08/<strong>2009</strong>). Make-up runs were conducted on 01/08/<strong>2009</strong>,<br />
06/08/<strong>2009</strong> and 12/08/<strong>2009</strong>. Data recovery for <strong>2009</strong> was 100 per cent.<br />
Maison Dieu TSP missed 14 scheduled run dates due to unit failure (12/01/<strong>2009</strong>, 11/02/<strong>2009</strong>, 23/02/<strong>2009</strong>,<br />
21/09/<strong>2009</strong>, 20/12/<strong>2009</strong> and 26/12/<strong>2009</strong>), due to unit operating time +/- 24 hours (18/01/<strong>2009</strong>, 01/03/<strong>2009</strong>,<br />
19/03/<strong>2009</strong>, 09/09/<strong>2009</strong>, 03/10/<strong>2009</strong>, 09/10/<strong>2009</strong> and 15/10/<strong>2009</strong>) and sampling error (10/08/<strong>2009</strong>). Make-up<br />
runs were conducted on 19/02/<strong>2009</strong>, 11/03/<strong>2009</strong>, 25/02/<strong>2009</strong>, 01/10/<strong>2009</strong>, 15/01/2010, 05/01/2010,<br />
05/03/<strong>2009</strong>, 17/03/<strong>2009</strong>, 08/04/<strong>2009</strong>, 12/09/<strong>2009</strong>, 29/10/<strong>2009</strong>, 12/11/<strong>2009</strong>, 17/11/<strong>2009</strong> and 23/10/<strong>2009</strong><br />
respectively. Data recovery for <strong>2009</strong> was 100 per cent.<br />
Knodlers Lane TSP missed seven scheduled run dates due to power failure (11/02/<strong>2009</strong> and 05/06/<strong>2009</strong>),<br />
due to unit operating time +/- 24 hours (30/05/<strong>2009</strong>, 11/07/<strong>2009</strong> and 22/08/<strong>2009</strong>), due to invalid data<br />
(10/08/<strong>2009</strong>) and due to unit failure (20/12/<strong>2009</strong>). Make-up runs were conducted on 13/02/<strong>2009</strong>, 25/07/<strong>2009</strong>,<br />
13/06/<strong>2009</strong>, 06/08/<strong>2009</strong>, 26/08/<strong>2009</strong>, 23/10/<strong>2009</strong> and 23/12/<strong>2009</strong>. Data recovery for <strong>2009</strong> was 100 per cent.<br />
Warkworth School TSP missed six scheduled run dates due to power failure (11/02/<strong>2009</strong> and 17/06/<strong>2009</strong>),<br />
due to unit operating time +/- 24 hours (9/10/<strong>2009</strong>, 21/10/<strong>2009</strong> and 20/12/<strong>2009</strong>) and due to sampling error<br />
(10/08/<strong>2009</strong>). Make-up runs were conducted on 13/02/<strong>2009</strong>, 21/06/<strong>2009</strong>, 12/11/<strong>2009</strong>, 29/10/<strong>2009</strong>, 22/12/<strong>2009</strong><br />
and 23/10/<strong>2009</strong> respectively. Data recovery for <strong>2009</strong> was 100 per cent.<br />
Kilburnie South TSP missed three scheduled run dates due to power failure (11/02/<strong>2009</strong>), due to invalid data<br />
(10/08/<strong>2009</strong>) and due to unit operating time +/- 24 hours (09/09/<strong>2009</strong>). Make-up runs were conducted on<br />
13/02/<strong>2009</strong>, 24/10/<strong>2009</strong> and 17/09/<strong>2009</strong> respectively. Data recovery was 100 per cent in <strong>2009</strong>.<br />
Cheshunt East TSP missed five scheduled run dates due to unit failure (6/01/<strong>2009</strong>), due to unit operating time<br />
+/- 24 hours (18/01/<strong>2009</strong> and 24/04/<strong>2009</strong>), due to invalid data (10/08/<strong>2009</strong>) and due to power failure<br />
(26/11/<strong>2009</strong>). Make-up runs were conducted on 28/01/<strong>2009</strong>, 01/02/<strong>2009</strong>, 02/05/<strong>2009</strong>, 23/10/<strong>2009</strong> and<br />
28/11/<strong>2009</strong> respectively. Data recovery for <strong>2009</strong> was 100 per cent.<br />
Data capture for Jerrys Plains School TSP was provided by data share with Anglo Coal from 1 January to 31<br />
December <strong>2009</strong>. Data recovery for this site was 100 per cent in <strong>2009</strong>.<br />
Wandewoi PM 10 missed two scheduled run dates due to invalid data (10/08/<strong>2009</strong>) and due to unit operating<br />
time +/- 24 hours (15/09/<strong>2009</strong>). Make-up runs were conducted on 24/10/<strong>2009</strong> and 17/09/<strong>2009</strong>. Data recovery<br />
for <strong>2009</strong> was 100 per cent.<br />
Maison Dieu PM 10 missed seven scheduled run dates due to unit failure to run (12/01/<strong>2009</strong>, 18/05/<strong>2009</strong> and<br />
24/05/<strong>2009</strong>), due to unit operating time +/- 24 hours (18/01/<strong>2009</strong>), due to power failure (11/02/<strong>2009</strong> and<br />
23/02/<strong>2009</strong>) and due to sampling error (10/08/<strong>2009</strong>). Make-up runs were conducted on 28/01/<strong>2009</strong>,<br />
25/07/<strong>2009</strong>, 2/06/<strong>2009</strong>, 4/03/<strong>2009</strong>, 5/03/<strong>2009</strong>, 25/02/<strong>2009</strong> and 23/10/<strong>2009</strong> respectively. Data recovery for<br />
<strong>2009</strong> was 100 per cent.<br />
Warkworth School PM 10 missed three scheduled run dates due to power failure (11/02/<strong>2009</strong> and 17/06/<strong>2009</strong>)<br />
and due to invalid data (10/08/<strong>2009</strong>). Make-up runs were conducted on 13/02/<strong>2009</strong>, 21/06/<strong>2009</strong> and<br />
23/10/<strong>2009</strong>. Data recovery for <strong>2009</strong> was 100 per cent.<br />
Cheshunt East PM 10 missed three scheduled run dates due to unit operating time +/- 24 hours (24/04/<strong>2009</strong><br />
and 08/11/<strong>2009</strong>) and due to unit failure (10/08/<strong>2009</strong>). Make-up runs were conducted on 2/05/<strong>2009</strong>,<br />
22/12/<strong>2009</strong> and 12/08/<strong>2009</strong> respectively. Data recovery for <strong>2009</strong> was 100 per cent.<br />
AEMR <strong>2009</strong> 62