Coal & Allied – Hunter Valley Operations<br />

High Volume Air Samplers<br />

Suspended particulate dust was measured in <strong>2009</strong> by a network of HVAS monitors, consisting of seven TSP<br />

samplers and six PM 10 samplers. A data share arrangement is in place with Anglo Coal for a TSP unit at<br />

Jerrys Plains School. The Long Point PM 10 monitor was commissioned in June <strong>2009</strong>, consequently the <strong>2009</strong><br />

average is based on 7 months data. The Long Point PM 10 is not a reportable site and is included here for<br />

information purposes only.<br />

TSP and PM 10 Data Recovery<br />

The following information describes the data capture for the reporting period.<br />

Wandewoi TSP missed three scheduled run dates due to unit operating time +/- 24 hours (17/07/<strong>2009</strong> and<br />

29/07/<strong>2009</strong>) and due to unit failure to run (10/08/<strong>2009</strong>). Make-up runs were conducted on 01/08/<strong>2009</strong>,<br />

06/08/<strong>2009</strong> and 12/08/<strong>2009</strong>. Data recovery for <strong>2009</strong> was 100 per cent.<br />

Maison Dieu TSP missed 14 scheduled run dates due to unit failure (12/01/<strong>2009</strong>, 11/02/<strong>2009</strong>, 23/02/<strong>2009</strong>,<br />

21/09/<strong>2009</strong>, 20/12/<strong>2009</strong> and 26/12/<strong>2009</strong>), due to unit operating time +/- 24 hours (18/01/<strong>2009</strong>, 01/03/<strong>2009</strong>,<br />

19/03/<strong>2009</strong>, 09/09/<strong>2009</strong>, 03/10/<strong>2009</strong>, 09/10/<strong>2009</strong> and 15/10/<strong>2009</strong>) and sampling error (10/08/<strong>2009</strong>). Make-up<br />

runs were conducted on 19/02/<strong>2009</strong>, 11/03/<strong>2009</strong>, 25/02/<strong>2009</strong>, 01/10/<strong>2009</strong>, 15/01/2010, 05/01/2010,<br />

05/03/<strong>2009</strong>, 17/03/<strong>2009</strong>, 08/04/<strong>2009</strong>, 12/09/<strong>2009</strong>, 29/10/<strong>2009</strong>, 12/11/<strong>2009</strong>, 17/11/<strong>2009</strong> and 23/10/<strong>2009</strong><br />

respectively. Data recovery for <strong>2009</strong> was 100 per cent.<br />

Knodlers Lane TSP missed seven scheduled run dates due to power failure (11/02/<strong>2009</strong> and 05/06/<strong>2009</strong>),<br />

due to unit operating time +/- 24 hours (30/05/<strong>2009</strong>, 11/07/<strong>2009</strong> and 22/08/<strong>2009</strong>), due to invalid data<br />

(10/08/<strong>2009</strong>) and due to unit failure (20/12/<strong>2009</strong>). Make-up runs were conducted on 13/02/<strong>2009</strong>, 25/07/<strong>2009</strong>,<br />

13/06/<strong>2009</strong>, 06/08/<strong>2009</strong>, 26/08/<strong>2009</strong>, 23/10/<strong>2009</strong> and 23/12/<strong>2009</strong>. Data recovery for <strong>2009</strong> was 100 per cent.<br />

Warkworth School TSP missed six scheduled run dates due to power failure (11/02/<strong>2009</strong> and 17/06/<strong>2009</strong>),<br />

due to unit operating time +/- 24 hours (9/10/<strong>2009</strong>, 21/10/<strong>2009</strong> and 20/12/<strong>2009</strong>) and due to sampling error<br />

(10/08/<strong>2009</strong>). Make-up runs were conducted on 13/02/<strong>2009</strong>, 21/06/<strong>2009</strong>, 12/11/<strong>2009</strong>, 29/10/<strong>2009</strong>, 22/12/<strong>2009</strong><br />

and 23/10/<strong>2009</strong> respectively. Data recovery for <strong>2009</strong> was 100 per cent.<br />

Kilburnie South TSP missed three scheduled run dates due to power failure (11/02/<strong>2009</strong>), due to invalid data<br />

(10/08/<strong>2009</strong>) and due to unit operating time +/- 24 hours (09/09/<strong>2009</strong>). Make-up runs were conducted on<br />

13/02/<strong>2009</strong>, 24/10/<strong>2009</strong> and 17/09/<strong>2009</strong> respectively. Data recovery was 100 per cent in <strong>2009</strong>.<br />

Cheshunt East TSP missed five scheduled run dates due to unit failure (6/01/<strong>2009</strong>), due to unit operating time<br />

+/- 24 hours (18/01/<strong>2009</strong> and 24/04/<strong>2009</strong>), due to invalid data (10/08/<strong>2009</strong>) and due to power failure<br />

(26/11/<strong>2009</strong>). Make-up runs were conducted on 28/01/<strong>2009</strong>, 01/02/<strong>2009</strong>, 02/05/<strong>2009</strong>, 23/10/<strong>2009</strong> and<br />

28/11/<strong>2009</strong> respectively. Data recovery for <strong>2009</strong> was 100 per cent.<br />

Data capture for Jerrys Plains School TSP was provided by data share with Anglo Coal from 1 January to 31<br />

December <strong>2009</strong>. Data recovery for this site was 100 per cent in <strong>2009</strong>.<br />

Wandewoi PM 10 missed two scheduled run dates due to invalid data (10/08/<strong>2009</strong>) and due to unit operating<br />

time +/- 24 hours (15/09/<strong>2009</strong>). Make-up runs were conducted on 24/10/<strong>2009</strong> and 17/09/<strong>2009</strong>. Data recovery<br />

for <strong>2009</strong> was 100 per cent.<br />

Maison Dieu PM 10 missed seven scheduled run dates due to unit failure to run (12/01/<strong>2009</strong>, 18/05/<strong>2009</strong> and<br />

24/05/<strong>2009</strong>), due to unit operating time +/- 24 hours (18/01/<strong>2009</strong>), due to power failure (11/02/<strong>2009</strong> and<br />

23/02/<strong>2009</strong>) and due to sampling error (10/08/<strong>2009</strong>). Make-up runs were conducted on 28/01/<strong>2009</strong>,<br />

25/07/<strong>2009</strong>, 2/06/<strong>2009</strong>, 4/03/<strong>2009</strong>, 5/03/<strong>2009</strong>, 25/02/<strong>2009</strong> and 23/10/<strong>2009</strong> respectively. Data recovery for<br />

<strong>2009</strong> was 100 per cent.<br />

Warkworth School PM 10 missed three scheduled run dates due to power failure (11/02/<strong>2009</strong> and 17/06/<strong>2009</strong>)<br />

and due to invalid data (10/08/<strong>2009</strong>). Make-up runs were conducted on 13/02/<strong>2009</strong>, 21/06/<strong>2009</strong> and<br />

23/10/<strong>2009</strong>. Data recovery for <strong>2009</strong> was 100 per cent.<br />

Cheshunt East PM 10 missed three scheduled run dates due to unit operating time +/- 24 hours (24/04/<strong>2009</strong><br />

and 08/11/<strong>2009</strong>) and due to unit failure (10/08/<strong>2009</strong>). Make-up runs were conducted on 2/05/<strong>2009</strong>,<br />

22/12/<strong>2009</strong> and 12/08/<strong>2009</strong> respectively. Data recovery for <strong>2009</strong> was 100 per cent.<br />

AEMR <strong>2009</strong> 62