HVO 2009 Annual Environmental Management Report - Final
HVO 2009 Annual Environmental Management Report - Final
HVO 2009 Annual Environmental Management Report - Final
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Coal & Allied – Hunter Valley Operations<br />
Location Data Recovery (%) Comments<br />
S6 0%<br />
Site recorded as dry 02/03/<strong>2009</strong> (special sampling),<br />
17/03/<strong>2009</strong>, 08/04/<strong>2009</strong> (special sampling), 02/06/<strong>2009</strong>,<br />
09/09/<strong>2009</strong> and 22/12/<strong>2009</strong>.<br />
H5032/5 100%<br />
H5038/5 100%<br />
Alluvial Lands Levee bank Groundwater<br />
PZ1CH200 100%<br />
PZ2CH400 100%<br />
PZ3CH800 100%<br />
PZ4CH1380 100%<br />
PZ5CH1800 100%<br />
PZ6CH2450 100%<br />
HV3 100%<br />
HV4 0%<br />
Site recorded as dry 05/03/<strong>2009</strong>, 02/06/<strong>2009</strong>, 28/09/<strong>2009</strong>,<br />
04/11/<strong>2009</strong> and 05/01/2010.<br />
GA3 100%<br />
Cheshunt Stage 1 Groundwater<br />
BC1 0%<br />
Site recorded as dry02/03/<strong>2009</strong> (special sampling),<br />
17/03/<strong>2009</strong>, 08/04/<strong>2009</strong> (special sampling), 16/06/<strong>2009</strong>,<br />
14/09/<strong>2009</strong> and 04/01/2010.<br />
BC1a 75% Site recorded as dry 17/03/<strong>2009</strong>.<br />
BZ1-1 100%<br />
BZ1-2 0%<br />
No access to site 02/03/<strong>2009</strong> (non-routine). Site recorded as<br />
dry 17/03/<strong>2009</strong>, 08/04/<strong>2009</strong>(non-routine), 16/06/<strong>2009</strong>,<br />
14/09/<strong>2009</strong> and 05/01/2010.<br />
BZ1-3 100%<br />
BZ3-1 100%<br />
BZ3-2 100%<br />
BZ3-3 100%<br />
AEMR <strong>2009</strong> 93