12.06.2014 Views

HVO 2009 Annual Environmental Management Report - Final

HVO 2009 Annual Environmental Management Report - Final

HVO 2009 Annual Environmental Management Report - Final

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Coal & Allied – Hunter Valley Operations<br />

Location Data Recovery (%) Comments<br />

S6 0%<br />

Site recorded as dry 02/03/<strong>2009</strong> (special sampling),<br />

17/03/<strong>2009</strong>, 08/04/<strong>2009</strong> (special sampling), 02/06/<strong>2009</strong>,<br />

09/09/<strong>2009</strong> and 22/12/<strong>2009</strong>.<br />

H5032/5 100%<br />

H5038/5 100%<br />

Alluvial Lands Levee bank Groundwater<br />

PZ1CH200 100%<br />

PZ2CH400 100%<br />

PZ3CH800 100%<br />

PZ4CH1380 100%<br />

PZ5CH1800 100%<br />

PZ6CH2450 100%<br />

HV3 100%<br />

HV4 0%<br />

Site recorded as dry 05/03/<strong>2009</strong>, 02/06/<strong>2009</strong>, 28/09/<strong>2009</strong>,<br />

04/11/<strong>2009</strong> and 05/01/2010.<br />

GA3 100%<br />

Cheshunt Stage 1 Groundwater<br />

BC1 0%<br />

Site recorded as dry02/03/<strong>2009</strong> (special sampling),<br />

17/03/<strong>2009</strong>, 08/04/<strong>2009</strong> (special sampling), 16/06/<strong>2009</strong>,<br />

14/09/<strong>2009</strong> and 04/01/2010.<br />

BC1a 75% Site recorded as dry 17/03/<strong>2009</strong>.<br />

BZ1-1 100%<br />

BZ1-2 0%<br />

No access to site 02/03/<strong>2009</strong> (non-routine). Site recorded as<br />

dry 17/03/<strong>2009</strong>, 08/04/<strong>2009</strong>(non-routine), 16/06/<strong>2009</strong>,<br />

14/09/<strong>2009</strong> and 05/01/2010.<br />

BZ1-3 100%<br />

BZ3-1 100%<br />

BZ3-2 100%<br />

BZ3-3 100%<br />

AEMR <strong>2009</strong> 93

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!