12.06.2014 Views

HVO 2009 Annual Environmental Management Report - Final

HVO 2009 Annual Environmental Management Report - Final

HVO 2009 Annual Environmental Management Report - Final

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Coal & Allied – Hunter Valley Operations<br />

Kilburnie South PM 10 missed three scheduled run dates due to power failure (11/02/<strong>2009</strong>), invalid data<br />

(10/08/<strong>2009</strong>) and due to unit operating time +/- 24 hours (21/10/<strong>2009</strong>). Make-up runs were conducted on<br />

13/02/<strong>2009</strong>, 24/10/<strong>2009</strong> and 29/10/<strong>2009</strong> respectively. Data recovery for <strong>2009</strong> was 100 per cent.<br />

Jerrys Plains School PM 10 missed three scheduled run dates due to power failure (11/02/<strong>2009</strong>), due to unit<br />

operating time +/- 24 hours (12/05/<strong>2009</strong>) and due to invalid data (10/08/<strong>2009</strong>). Make-up runs were conducted<br />

on 13/02/<strong>2009</strong>, 15/05/<strong>2009</strong> and 24/10/<strong>2009</strong> respectively. Data recovery for <strong>2009</strong> was 100 per cent.<br />

Long Point PM 10 missed two scheduled run dates due to unit operating time +/- 24 hours (29/07/<strong>2009</strong>) and<br />

due to invalid data (10/08/<strong>2009</strong>). Make-up runs were conducted on 01/08/<strong>2009</strong> and 23/10/<strong>2009</strong> respectively.<br />

Data recovery for <strong>2009</strong> was 100 per cent.<br />

TSP <strong>Annual</strong> Average Assessment<br />

TSP monitors were sampled and analysed in accordance with AS 3580.9.3 (2003). The TSP impact<br />

assessment criterion is an annual average concentration of 90μg/m 3 . TSP results are shown in Table 19 and<br />

Figure 23 to Figure 24. During <strong>2009</strong> all sites were in compliance with the long term criterion of 90μg/m 3 .<br />

Generally TSP results were higher in <strong>2009</strong> compared with 2008. A decrease in annual rainfall in <strong>2009</strong><br />

compared with 2008 is likely to have contributed to higher dust levels, particularly during August through to<br />

November which typically coincides with hot and dry weather conditions.<br />

Table 19: TSP Monitoring Results for <strong>HVO</strong> in <strong>2009</strong><br />

Monitor<br />

<strong>Annual</strong> Assessment<br />

Criteria (g/m3)<br />

Mean (g/m3)<br />

<strong>2009</strong> 2008 2007<br />

Wandewoi 90 46.4 40.3 48.5<br />

Maison Dieu 90 61.3 50.4 59.9<br />

Knodlers Lane 90 67.0 59.0 60.9<br />

Warkworth School 90 53.3 49.4 65.8<br />

Kilburnie Sth 90 42.5 36.6 51.9<br />

Cheshunt East 90 60.5 52.6* 75.3<br />

Jerrys Plains School 90 59.9 52.0 48.6<br />

* Cheshunt East TSP data was provided by data share (HV5 Cheshunt East TSP) for the months January to<br />

August 2008. Coal & Allied commissioned a monitor for the 21 st August 2008. This average represents the<br />

data from both monitors.<br />

AEMR <strong>2009</strong> 63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!