HVO 2009 Annual Environmental Management Report - Final
HVO 2009 Annual Environmental Management Report - Final
HVO 2009 Annual Environmental Management Report - Final
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Coal & Allied – Hunter Valley Operations<br />
Kilburnie South PM 10 missed three scheduled run dates due to power failure (11/02/<strong>2009</strong>), invalid data<br />
(10/08/<strong>2009</strong>) and due to unit operating time +/- 24 hours (21/10/<strong>2009</strong>). Make-up runs were conducted on<br />
13/02/<strong>2009</strong>, 24/10/<strong>2009</strong> and 29/10/<strong>2009</strong> respectively. Data recovery for <strong>2009</strong> was 100 per cent.<br />
Jerrys Plains School PM 10 missed three scheduled run dates due to power failure (11/02/<strong>2009</strong>), due to unit<br />
operating time +/- 24 hours (12/05/<strong>2009</strong>) and due to invalid data (10/08/<strong>2009</strong>). Make-up runs were conducted<br />
on 13/02/<strong>2009</strong>, 15/05/<strong>2009</strong> and 24/10/<strong>2009</strong> respectively. Data recovery for <strong>2009</strong> was 100 per cent.<br />
Long Point PM 10 missed two scheduled run dates due to unit operating time +/- 24 hours (29/07/<strong>2009</strong>) and<br />
due to invalid data (10/08/<strong>2009</strong>). Make-up runs were conducted on 01/08/<strong>2009</strong> and 23/10/<strong>2009</strong> respectively.<br />
Data recovery for <strong>2009</strong> was 100 per cent.<br />
TSP <strong>Annual</strong> Average Assessment<br />
TSP monitors were sampled and analysed in accordance with AS 3580.9.3 (2003). The TSP impact<br />
assessment criterion is an annual average concentration of 90μg/m 3 . TSP results are shown in Table 19 and<br />
Figure 23 to Figure 24. During <strong>2009</strong> all sites were in compliance with the long term criterion of 90μg/m 3 .<br />
Generally TSP results were higher in <strong>2009</strong> compared with 2008. A decrease in annual rainfall in <strong>2009</strong><br />
compared with 2008 is likely to have contributed to higher dust levels, particularly during August through to<br />
November which typically coincides with hot and dry weather conditions.<br />
Table 19: TSP Monitoring Results for <strong>HVO</strong> in <strong>2009</strong><br />
Monitor<br />
<strong>Annual</strong> Assessment<br />
Criteria (g/m3)<br />
Mean (g/m3)<br />
<strong>2009</strong> 2008 2007<br />
Wandewoi 90 46.4 40.3 48.5<br />
Maison Dieu 90 61.3 50.4 59.9<br />
Knodlers Lane 90 67.0 59.0 60.9<br />
Warkworth School 90 53.3 49.4 65.8<br />
Kilburnie Sth 90 42.5 36.6 51.9<br />
Cheshunt East 90 60.5 52.6* 75.3<br />
Jerrys Plains School 90 59.9 52.0 48.6<br />
* Cheshunt East TSP data was provided by data share (HV5 Cheshunt East TSP) for the months January to<br />
August 2008. Coal & Allied commissioned a monitor for the 21 st August 2008. This average represents the<br />
data from both monitors.<br />
AEMR <strong>2009</strong> 63