Coal & Allied – Hunter Valley Operations<br />

Blast exceeded 115 dB<br />

on 21 Jan 09<br />

Wind affected result<br />

Warkworth<br />

Blast exceeded 120 dB<br />

on 6 July 09<br />

130<br />

11<br />

120<br />

10<br />

Overpressure (dB)<br />

110<br />

100<br />

90<br />

80<br />

70<br />

60<br />

9<br />

8<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

Ground Vibration (mm/s)<br />

50<br />

1<br />

40<br />

0<br />

Jan<br />

Feb<br />

March<br />

April<br />

May<br />

June<br />

July<br />

Aug<br />

Sept<br />

Oct<br />

Nov<br />

Dec<br />

Overpressure dB(L)<br />

EPA Overpressure Limt for Max 5% of Blasts<br />

EPA Ground Vibration Limit<br />

EPA Overpressure Limit<br />

Ground Vibration (mm/s)<br />

EPA Ground Vibration Limit for Max 5% of Blasts<br />

Figure 76: Warkworth Blast Monitoring Results <strong>2009</strong><br />

AEMR <strong>2009</strong> 129