12.06.2014 Views

HVO 2009 Annual Environmental Management Report - Final

HVO 2009 Annual Environmental Management Report - Final

HVO 2009 Annual Environmental Management Report - Final

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Coal & Allied – Hunter Valley Operations<br />

Cheshunt Groundwater<br />

Cheshunt piezometers are sampled quarterly subject to safe access. Interpretation of Cheshunt groundwater<br />

has been previously based on stage one bore sites; BZ1(1-3), BZ3(1-3), BZ4A(1-2), BZ4B, BZ5(1-2), BZ8(1-<br />

3), HG2, HG2A and HG3.<br />

Stage two bores installed into targeted Cheshunt Pit seams in advance of mining came on line in May 2008.<br />

Several of the bores contain multiple piezometers and provide water level and EC data as far down as the<br />

Bayswater seam. These new bores include sites BUNC44D, BUNC46D, CHPZ12A, CHPZ12D, CHPZ13A,<br />

CHPZ13D, CHPZ14A and CHPZ14D.<br />

Samples were unable to be collected from BC1, BZ1-2, BZ4B, BZ5-1, BZ5-2 and BZ8-1 as sites were<br />

reported as dry during the reporting period. December sampling was unable to occur as scheduled. As such a<br />

make up run was performed in January 2010. Monitoring results for <strong>2009</strong> are shown in Table 38 and Table 39<br />

and in Figure 57 to Figure 62.<br />

A Groundwater Impacts <strong>Report</strong> for <strong>HVO</strong> South is provided in Appendix 10 in accordance with the <strong>HVO</strong> South<br />

Development Consent.<br />

Table 38: Groundwater Results from Cheshunt Stage 1 Groundwater’s for <strong>2009</strong><br />

Location<br />

EC (S/cm)<br />

Average Min Max Average Min Max<br />

pH<br />

BC1 NA NA NA NA NA NA<br />

BC1a 1,540 920 2,780 7.3 7.1 7.4<br />

BZ1-1 6,498 2,800 11,300 7.1 7.0 7.2<br />

BZ1-2 NA NA NA NA NA NA<br />

BZ1-3 1,388 1,290 1,600 7.5 7.3 8.1<br />

BZ3-1 1,783 1,070 3,690 7.2 7.0 7.5<br />

BZ3-2 4,810 2,460 6,780 7.3 7.2 7.4<br />

BZ3-3 1,468 1,340 1,670 6.9 6.7 7.1<br />

BZ4A(1) 14,083 14,020 14,120 6.7 6.6 6.7<br />

BZ4A(2) 2,045 1,970 2,160 6.7 6.5 7.1<br />

BZ4B NA NA NA NA NA NA<br />

BZ5-1 NA NA NA NA NA NA<br />

BZ5-2 NA NA NA NA NA NA<br />

BZ8-1 NA NA NA NA NA NA<br />

BZ8-2 1,613 1,360 1,740 7.0 6.9 7.1<br />

AEMR <strong>2009</strong> 108

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!