12.06.2014 Views

HVO 2009 Annual Environmental Management Report - Final

HVO 2009 Annual Environmental Management Report - Final

HVO 2009 Annual Environmental Management Report - Final

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Coal & Allied – Hunter Valley Operations<br />

Groundwater<br />

6,451 t (E)<br />

Coarse Reject<br />

1,413 t (E)<br />

LEGEND<br />

Affected mainly by geometry eg depth, length and geology<br />

Affected mainly by climate<br />

Rain<br />

3,649 t (E)<br />

Tails<br />

8,680 t (E)<br />

Affected mainly by process eg production rate, moisture control<br />

Affected both by climate and process<br />

Affected by geometry, geology and process<br />

Evaporation<br />

0 t<br />

Recycled Tails<br />

4,850 t (E)<br />

(M) = Measured (E) = Estimated<br />

Dust<br />

Suppression<br />

3,986 t<br />

HRSTS<br />

Discharges<br />

499 t (M)<br />

Open Cut Pits<br />

& Pit Storages<br />

Coal<br />

Processing<br />

Plants<br />

Internal<br />

Recycling<br />

1,345 t (E)<br />

Product Coal (E)<br />

4,469 t (E)<br />

Lost to Tails<br />

and Spoil<br />

7,068 t (E)<br />

Dewater<br />

5,441 t (E)<br />

Fresh<br />

0 t (E)<br />

Storage<br />

8,793 t (E)<br />

ROM Coal<br />

9,716 t (E)<br />

External (Poor)<br />

30 t (E)<br />

Figure 10: <strong>HVO</strong> Salt Balance Schematic Diagram<br />

AEMR <strong>2009</strong> 41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!