Coal & Allied – Hunter Valley Operations<br />

A GPR survey was also conducted to assess the sub-surface archaeological potential of Aboriginal site<br />

Barellan Open Site 37-5-0041. The GPR survey grid was conducted along three 300m long and eight 60m<br />

long transects across the area to map the underlying soil structure and presence of sub-surface<br />

archaeological deposits and to confirm the general extent of the site. This information will assist in planning<br />

for any future excavation of the site if subject to future development activities.<br />

Barellan Open Site (AHIMS 37-5-0041)<br />

In April <strong>2009</strong>, McCardle Cultural Heritage Pty Ltd (MCH) was commissioned by Coal & Allied Operations to<br />

conduct an Aboriginal cultural heritage assessment of farming land around an existing Aboriginal<br />

archaeological site Barellan Open Site (AHIMS 37-5-0041) following the GPR surveys to assess potential<br />

impact and management requirements for a proposed mine water dam and relocation of existing electrical<br />

transmission lines and sub-station. An area of approximately 40ha was comprehensively surveyed with a<br />

series of 100m wide pedestrian transects. The fieldwork was conducted over one day with a field team of six<br />

Aboriginal community field officers, a technical advisor (MCH), Coal & Allied data management officer and<br />

site supervisor.<br />

A total of six sites were recorded (four isolated finds and two artefact scatters) one of which had been<br />

previously recorded as Barellan Open Site (37-5-0041). Two Potential Archaeological Deposits (PADs) were<br />

also identified, including the Barellan Open Site:<br />

<br />

<br />

PAD 1 (Transect 90): Horizon A remains intact with little disturbance; and<br />

PAD 2 (Transect 86, including Open sites <strong>HVO</strong>-981 & <strong>HVO</strong>-982 - 37-5-0041): extends along the creek for<br />

more than 225m x 80m. This area is relatively undisturbed.<br />

A 500m x 150m buffer area has been fenced off around the Barellan Open Site (37-5-0041). MCH submitted<br />

an assessment report to DECCW in September <strong>2009</strong>.<br />

Plashett Pipeline Assessment: <strong>HVO</strong> West Pit:<br />

In April <strong>2009</strong> MCH was commissioned by Coal & Allied Operations to conduct an Aboriginal cultural heritage<br />

assessment of a proposed over-ground poly-pipeline from <strong>HVO</strong> Parnells Dam to Plashett Dam on behalf of<br />

Coal & Allied and Macquarie Generation. The pipeline easement assessment involved the pedestrian survey<br />

of a 1.3km x 40m wide transect to find a suitable route that would not disturb any cultural heritage sites. The<br />

fieldwork was conducted over one day with a field team of three Aboriginal community field officers, a<br />

technical advisor (MCH), Coal & Allied data management officer and site supervisor.<br />

The aim of the assessment survey was to identify and avoid disturbing Aboriginal cultural heritage sites,<br />

implement zones of management for sensitive areas, and mitigate impacts where avoidance or management<br />

is not possible. If avoidance is not possible a s90 consent application will be submitted to DECCW by<br />

Macquarie Generation for salvage of the site/s. Sites within close proximity to the proposed route will be<br />

barricaded and signposted to mitigate, any potential impacts from the proposed development. A new artefact<br />

scatter, identified as site <strong>HVO</strong>-986, was recorded within the study area. MCH recorded 50 artefacts, including<br />

flakes and cores within the extent of site <strong>HVO</strong>-986. The alignment and installation of the over-ground polypipeline<br />

is too conducted to avoid impacting site <strong>HVO</strong>-986.<br />

Xstrata Ravensworth Extension Assessment – Coal & Allied Lands, <strong>HVO</strong> North:<br />

During late May and early June <strong>2009</strong> a comprehensive Aboriginal cultural heritage assessment survey was<br />

conducted over approximately 340ha of Coal & Allied owned lands as part of the Xstrata Ravensworth<br />

Extension Project Aboriginal heritage assessment was managed by Umwelt Australia Pty Ltd on behalf of<br />

Xstrata Coal. Under a land access agreement between Coal & Allied and Xstrata Coal, Umwelt’s sampling<br />

survey methodology was modified to ensure compliance with Rio Tinto Coal Australia CHMS procedures that<br />

require 100 per cent survey coverage for areas surveyed on Coal & Allied owned lands.<br />

The Umwelt survey over the Coal & Allied lands was conducted over 10 days and involved a field team of six<br />

Aboriginal community field officers, two archaeologists (Umwelt), a Coal & Allied data management officer<br />

and a site supervisor. A total of 133 archaeological sites were recorded within the Coal & Allied land study<br />

area which included several scarred trees and artefact scatters, with the greater majority of sites being<br />

isolated artefacts.<br />

AEMR <strong>2009</strong> 142