District Watershed <strong>Development</strong> Unit - Jamnagar<br />

Table No, 41.5, Cost Estimation <strong>of</strong> Farm pond No.1<br />

Sr. No. Description Unit Quantity Rate (Rs.) Amount<br />

1 General Work<br />

Clearing bushes / Dag Belling 2.5 to 5.00 cm deep Mt 100 20.00 2000<br />

2 Earth Work<br />

Construction <strong>of</strong> earthen bund (dry <strong>of</strong> moist) excavation and laying in 15 cm layer, breaking<br />

160<br />

<strong>of</strong> clods, separating leaves and small stones, dressing and compaction with sheep foot roller<br />

or a) ordinary hand rammer, soil uptp 1.5 meter lift and 50 meter lead.<br />

Cum 160 41.00 6560<br />

b) hard soil Cum 160 96.00 15360<br />

Sub Total 6560<br />

Contingency (3 %) 196.80<br />

Supervision Charges (1.5 %] 98.40<br />

Sub Total 6855.52<br />

Grand Total<br />

Table No, 41.6, Cost <strong>of</strong> Farm pond in Village Wise:-<br />

(Rs.)<br />

Say 6900/-<br />

Sr No. Village Name Nos. Of Pond Cost<br />

1 Patan 7 56000<br />

2 Paradava 5 40000<br />

3 Amrapar 10 80000<br />

4 Malavada 3 24000<br />

Total 25 200000/-<br />

Plains or Flat level:<br />

<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!