District Watershed <strong>Development</strong> Unit - Jamnagar<br />

Sr. No.<br />

Rate Amount<br />

Description Unit Quantity @SOR (Rs.)<br />

(Rs.)<br />

1 Earth Work in excavation in s<strong>of</strong>t soil upto 1.5 m depth and disposing Cum 2 41 82<br />

excavated stuff upto lead <strong>of</strong> 50 m.<br />

2 Earth Work in excavation in s<strong>of</strong>t rock upto 1.5 m depth and disposing<br />

2 96 192<br />

excavated stuff upto lead <strong>of</strong> 50 m.<br />

3 cc 1:4:8 as a foundation concrete for walls using 40 mm coarse aggregates Cum 0.4 1600 640<br />

including curing compaction etc completed<br />

4 uncoarse rubble masonary in cm 1:5 including racking out joints and<br />

finishing curing etc. completed (a) Below GL<br />

uncoarse rubble masonary in cm 1:5 including racking out joints and<br />

finishing curing etc. completed (a) Above GL<br />

Total Masonry quantity 5.73 1460 8365.80<br />

5 cc 1:2:4 as a coping at the top <strong>of</strong> walls including vibrating finishing curing Cum 0.3 2420 726<br />

etc. completed<br />

6 12 mm thick plaster on outer surface <strong>of</strong> walls in cm 1:3 including racking Sqm 4.35 78 339.30<br />

out joints 20 mm deep, curing finishing etc. completed<br />

7 Sub Total 10345.10<br />

Contigency (3 %) 310.35<br />