District Watershed <strong>Development</strong> Unit - Jamnagar<br />
5 cc 1:2:4 as a coping at the top <strong>of</strong> walls including vibrating finishing curing<br />
etc. completed<br />
6 12 mm thick plaster on outer surface <strong>of</strong> walls in cm 1:3 including racking<br />
out joints 20 mm deep, curing finishing etc. completed<br />
Cum 0.9 2420 2178<br />
Sqm 3 78 234<br />
6 Sub Total 10715<br />
Contigency (3 %) 321.45<br />
Supervision Charges (1.5%) 160.725<br />
Sub Total 482.17<br />
Grand Total 11197.17<br />
Say 11000.00<br />
Total 13 nos. <strong>of</strong> 30 m length for the project. (per Rmt cost 11000/-) Total cost 6688000.00<br />
40.16 Details <strong>of</strong> the Cause Way in Patan <strong>Project</strong><br />
Sr Name <strong>of</strong><br />
Activity Survey No. Estimated Cost<br />
No. Village<br />
1 Patan Cause Way Near Bochavadi Nesh 175,176 330000<br />
2 Pankhera Nadi Par Cause Way(Pankhera<br />
495000<br />
29/p2,29/p3,31/p1,2,31,34,36<br />
Nesh)<br />
<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )