District Watershed <strong>Development</strong> Unit - Jamnagar<br />

5 cc 1:2:4 as a coping at the top <strong>of</strong> walls including vibrating finishing curing<br />

etc. completed<br />

6 12 mm thick plaster on outer surface <strong>of</strong> walls in cm 1:3 including racking<br />

out joints 20 mm deep, curing finishing etc. completed<br />

Cum 0.9 2420 2178<br />

Sqm 3 78 234<br />

6 Sub Total 10715<br />

Contigency (3 %) 321.45<br />

Supervision Charges (1.5%) 160.725<br />

Sub Total 482.17<br />

Grand Total 11197.17<br />

Say 11000.00<br />

Total 13 nos. <strong>of</strong> 30 m length for the project. (per Rmt cost 11000/-) Total cost 6688000.00<br />

40.16 Details <strong>of</strong> the Cause Way in Patan <strong>Project</strong><br />

Sr Name <strong>of</strong><br />

Activity Survey No. Estimated Cost<br />

No. Village<br />

1 Patan Cause Way Near Bochavadi Nesh 175,176 330000<br />

2 Pankhera Nadi Par Cause Way(Pankhera<br />

495000<br />

29/p2,29/p3,31/p1,2,31,34,36<br />

Nesh)<br />

<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )