District Watershed <strong>Development</strong> Unit - Jamnagar<br />
2 Paradava 0.02247 0.05619 0.02247 0.300 0.44 0.02247 0.020 2.24<br />
3 Amrapar 0.03419 0.08547 0.03419 0.370 0.64 0.03419 0.020 3.41<br />
4 Malvada 0.01171 0.02928 0.01171 0.170 0.23 0.01171 0.020 1.17<br />
4.3.2 Watershed <strong>Development</strong> Works:<br />
Watershed development works is to be done during implementation phase <strong>of</strong> watershed. Treatments begin from the highest point <strong>of</strong> the watershed and<br />
move progressively downwards (ridge to valley), starting with the smallest stream and culminating in the main river <strong>of</strong> the watershed. Work is<br />
location-specific, varying according to slope and geology as also the size <strong>of</strong> the stream being treated. The aim is to weave interventions into the contours <strong>of</strong><br />
nature, not to seek mastery over it. A net budget <strong>of</strong> 50 percent is allotted for this work.<br />
.<br />
Ridge Area Treatment Plans<br />
In a watershed, the slopes falling from the ridge to the beginning <strong>of</strong> the plains are called ridge area. It is very important to treat the higher reaches <strong>of</strong><br />
the ridge has this is where the major water resources originate. This involves mainly highly and forest region in the watershed. Various watershed<br />
managing structures should be build to arrest the erosion and degradation <strong>of</strong> forest with grasses in upper ridges.<br />
1. Boulder Checks<br />
2. Gabions3<br />
3. Grass seedling/planatation<br />
<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )