District Watershed <strong>Development</strong> Unit - Jamnagar<br />

These is at field level <strong>of</strong> farmers where farmers are operating at a very high labour intensive way. These generally field bunding , crop pattern alteration.<br />

The prime aim is to conserve the rain in the field<br />

Table No, 41.7 Technical Details <strong>of</strong> Farm Bund<br />

Particulars<br />

Value<br />

Bund Length Per Ha. 400 Mt.<br />

Proposed Area fare <strong>of</strong> farm) 1.00 Ha.<br />

Total Bund Length For Proposed Area(for whole project) 174500 Mt.<br />

Top Width 0.50 Mt.<br />

Side Slope 1.0 :0.75<br />

Height 1.0 Mt<br />

Base Width 2.0 Mt.<br />

Cross-Section <strong>of</strong> Farm bund 1.25 Sq Mt.<br />

Table No, 41.8, Quantity Excavation for Farm bund<br />

Sr.<br />

Description Unit Quantity<br />

No<br />

1 General Work<br />

2 Earth Work<br />

Construction <strong>of</strong> earthen bund (dry <strong>of</strong> moist) excavation and laying in 15 cm layer, breaking <strong>of</strong> clods, separating leaves<br />

and small stones, dressing and compaction with sheep foot roller or hand rammer, uptp 1.5 meter lift and 50 meter<br />

lead. a) ordinary soil Cum 218125<br />

b) hard soil<br />

3 Vegetative Work<br />

Sowing <strong>of</strong> seed on the constructed ridge Mt 174500<br />

4 Supply <strong>of</strong> Stylo/Dhaman Seed @ 4gm/mt in(single line) Kg 698<br />