District Watershed <strong>Development</strong> Unit - Jamnagar<br />
A detailed survey and Focused Group Discussion was conducted in Vinjalpar watershed area. The number and type <strong>of</strong> cattle as well as the fodder<br />
production capacity <strong>of</strong> the village was collect during these surveys. In focused group discussion several factors like the various types <strong>of</strong> fodder<br />
available locally, the quantity <strong>of</strong> fodder to be stored in the fodder bank, the size <strong>of</strong> fodder bank, the amount <strong>of</strong> finances required to operate a<br />
fodder bank etc were discussed with the farmers, User group and Watershed committee. The fodder bank should be sustainable and towards that,<br />
the sale price <strong>of</strong> fodder should cover operating costs and losses in storage. All these decisions were taken jointly with the member <strong>of</strong> operating<br />
fodder bank.<br />
Primary Model for A Fodder Bank<br />
A<br />
Total Dairy farmers 70<br />
No. <strong>of</strong> adult animals<br />
Calf<br />
No. <strong>of</strong> Cattle to be catered by one fodder bank.<br />
No.<br />
100<br />
<strong>of</strong> calves<br />
50<br />
Total Cattle<br />
Total<br />
Fodder requirement per day [10 kg dry fodder for adult and 4kg for<br />
calf.]<br />
Fodder requirement for 180 days.<br />
Fodder come from community land<br />
Cost <strong>of</strong> cultivation for fodder production (See table:2)<br />
Remaining requirement for 120 days Total Cost Avg. procurement<br />
150<br />
1000 kg for adult and 200 kg for calf<br />
Total 1200 kg per day.<br />
2160 Quintal<br />
5Ha * 200 (Qt. per Ha)=1000 quintal<br />
23,000 Rs<br />
2700-2250=450 quintal<br />
<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )