18.06.2014 Views

Detailed Project Report - Commissionerate of Rural Development ...

Detailed Project Report - Commissionerate of Rural Development ...

Detailed Project Report - Commissionerate of Rural Development ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

District Watershed <strong>Development</strong> Unit - Jamnagar<br />

A detailed survey and Focused Group Discussion was conducted in Vinjalpar watershed area. The number and type <strong>of</strong> cattle as well as the fodder<br />

production capacity <strong>of</strong> the village was collect during these surveys. In focused group discussion several factors like the various types <strong>of</strong> fodder<br />

available locally, the quantity <strong>of</strong> fodder to be stored in the fodder bank, the size <strong>of</strong> fodder bank, the amount <strong>of</strong> finances required to operate a<br />

fodder bank etc were discussed with the farmers, User group and Watershed committee. The fodder bank should be sustainable and towards that,<br />

the sale price <strong>of</strong> fodder should cover operating costs and losses in storage. All these decisions were taken jointly with the member <strong>of</strong> operating<br />

fodder bank.<br />

Primary Model for A Fodder Bank<br />

A<br />

Total Dairy farmers 70<br />

No. <strong>of</strong> adult animals<br />

Calf<br />

No. <strong>of</strong> Cattle to be catered by one fodder bank.<br />

No.<br />

100<br />

<strong>of</strong> calves<br />

50<br />

Total Cattle<br />

Total<br />

Fodder requirement per day [10 kg dry fodder for adult and 4kg for<br />

calf.]<br />

Fodder requirement for 180 days.<br />

Fodder come from community land<br />

Cost <strong>of</strong> cultivation for fodder production (See table:2)<br />

Remaining requirement for 120 days Total Cost Avg. procurement<br />

150<br />

1000 kg for adult and 200 kg for calf<br />

Total 1200 kg per day.<br />

2160 Quintal<br />

5Ha * 200 (Qt. per Ha)=1000 quintal<br />

23,000 Rs<br />

2700-2250=450 quintal<br />

<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!