Detailed Project Report - Commissionerate of Rural Development ...
Detailed Project Report - Commissionerate of Rural Development ...
Detailed Project Report - Commissionerate of Rural Development ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
District Watershed <strong>Development</strong> Unit - Jamnagar<br />
Table No 40.4 (A):- Cost Estimation <strong>of</strong> Staggered contour trench per Village<br />
Sr.no. Village Name Area (Ha) Nos. Cost<br />
1 Patan 100 10000<br />
2 Paradava 70 7000<br />
3 Amrapar 45 4500<br />
1250000<br />
875000<br />
562500<br />
4 Malavada 60 6000<br />
750000<br />
Total 305 27500 3437500/-<br />
Table No 40.4 (B):- Cost Estimation <strong>of</strong> Gully Plug per Village<br />
Sr No Villagae Name Gully Plug Nos. Cost<br />
1 Patan 300 2700000<br />
2 Paradava 70 630000<br />
3 Amrapar 40 360000<br />
4 Malavada 20 180000<br />
Total 430 3870000/-<br />
3.A Waste Vier for village pond<br />
It was proposed to draw a Waste Vier with the below specification to safe removal <strong>of</strong> run<strong>of</strong>f to control soil erosion.<br />
Table No 40.5, Technical Details <strong>of</strong> Waste Vier<br />
<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )