District Watershed <strong>Development</strong> Unit - Jamnagar<br />

Programmes/projects running in the district<br />

At present six IWMP projects have been sanctioned by Government <strong>of</strong> India for the Jamnagar district. The entry point activities <strong>of</strong> all the six<br />

IWMP projects have identified by the respective PIAs in the district. Jamnagar Forest Division as PIA for the four projects (IWMP-1, 2, 4 & 6)<br />

and DWDU-self is as PIA for the two projects (IWMP-3 & 5).<br />

Apart from the running six IWMP projects, total 614 pre-Hariyali & Hariyali projects (DDP,State watershed, EAS, IWDP) has been sanctioned<br />

and out <strong>of</strong> that 126 projects are completed and 488 projects are still running in the district. The DWDU Jamnagar is also monitoring a central<br />

government sponsored scheme on "Artificial Recharge <strong>of</strong> Groundwater through Dugwells" in the district.<br />

SWOT Analysis <strong>of</strong> the DWDU:<br />

Strength:<br />

(1) Dedicated and fully experience staffs and multidisciplinary team with required qualification<br />

(2) Independent District Level Nodal Agency with separate <strong>of</strong>fice.<br />

(3) Strong linkages with national and state level institutions, agricultural universities, and NGOs for capacity building and technical guidance<br />

(4) Scientific planning in watershed projects with the help <strong>of</strong> BISAG, Gandhinagar<br />

(5) District level monitoring, coordination & Cooperation Committee<br />

(6) Well establishment <strong>of</strong> PRIs for social audits<br />

<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )