Detailed Project Report - Commissionerate of Rural Development ...
Detailed Project Report - Commissionerate of Rural Development ...
Detailed Project Report - Commissionerate of Rural Development ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
District Watershed <strong>Development</strong> Unit - Jamnagar<br />
Total <strong>of</strong> 2. 8092 0 8092<br />
3. Protection<br />
a Fencing by Barbed wire (600 Rmt/Ha) 1111 15000 60000 75000<br />
Total <strong>of</strong> 3 15000 60000 75000<br />
4. Current Year<br />
Planting and cultural Operation<br />
a Raising <strong>of</strong> seedling casulity @ 20% 222 493 488 981<br />
b Transport <strong>of</strong> seedling including casuality 1333 800 533 1333<br />
Replacement<br />
c Application <strong>of</strong> DAP 10 gm. pit and insecticide 1111 141 266 407<br />
before planting<br />
d Planting with Khamna 1111 2201 0 2201<br />
e First weeding cum soil working 1111 1889 0 1889<br />
f Second weeding cum soil working 1111 1444 0 1444<br />
g Third weeding cum soil working 1111 1778 0 1778<br />
h Fertilizer Support watering 4 times 1111 7999 13332 13332<br />
i Repairs <strong>of</strong> fence & fire protection 1111 3447 240 3687<br />
j Misellaneous (Signage, Photographs etc) 1111 0 500 500<br />
Total <strong>of</strong> 4 20192 7360 27552<br />
5. First year cultural operation<br />
a Maintenance <strong>of</strong> casulity seedlings for casulity 222 353 57 410<br />
<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )